[Sn Code] China releases draft code of conduct for tin industry

Telah Terbit: Aug 03, 2015 17:53 (GMT+8)
The Chinese Ministry of Industry and Information Technology (MIIT) has announced a draft China Tin Industry Code of Conduct which will replace the 2006 version.

By Paul Ploumis 03 Aug 2015 Last updated at 06:02:59 GMT

BEIJING (Scrap Monster): The Chinese Ministry of Industry and Information Technology (MIIT) has announced a draft China Tin Industry Code of Conduct which will replace the 2006 version. The new code of conduct specifies stricter licensing rules and tougher standards of operation. It also recommends phasing out of certain furnaces and restriction of energy consumption.

The new code of conduct covers seven aspects:-

a)      Enterprise Layout

b)      Quality, Process and Equipment

c)      Energy Consumption

d)     Comprehensive utilization of resources

e)      Environmental protection

f)       Production safety

g)      Regulation Management

With the implementation of the new code of conduct, companies will be required to hold mining license and safety production license. The resources utilization plan relates to the standards to be followed in mining activity. The mine capacity must exceed 60,000 tonnes per annum. Also, the mine life should be above 10 years. The production target of single tin recycling projects is being increased from 3,000 tpy of tin content to 4,000 tpy.

The new code of conduct proposes phasing out of the reverberatory furnaces by 2020. Also, fuming furnaces shall be controlled with stricter regulations. The other major recommendations include sulphur dioxide control requirements and maximum utilization of available resources. In addition, stricter environmental controls will be imposed on tin mines, smelters, processors and recycling centres across the country.

The draft code of conduct is presently open to comments from the industry.

According to ITRI, the new code of conduct would lead to consolidation of tin industry and may drive small scale players out of the industry.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
25 Sep 2026 14:32 (GMT+8)
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
25 Sep 2026 14:32 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
25 Sep 2026 09:58 (GMT+8)
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Baca Selengkapnya
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon Metals mengumumkan telah menandatangani perjanjian definitif untuk mengakuisisi 100% deposit VMS tembaga-emas Turner di Oregon dari Gold Coast Mining. Imbalannya terdiri dari US$4,7 juta tunai, 4.778.761 saham Blue Moon senilai sekitar US$27 juta berdasarkan VWAP 20 hari, dan hingga US$7 juta dalam bentuk pencapaian tonggak yang terkait dengan perizinan eksplorasi/pengembangan bawah tanah, izin penambangan, dan produksi komersial. Penutupan transaksi diharapkan pada November 2026, dengan syarat persetujuan TSX Venture Exchange dan kondisi-kondisi lazim. Turner adalah deposit VMS tipe Siprus yang pernah berproduksi dan mengandung tembaga, emas, seng, perak, dan kobalt. Estimasi historis tahun 2010 melaporkan 2,447 juta ton pendek material Terindikasi dengan kadar 2,65% seng dan 2,084 juta ton pendek material Terestimasi dengan kadar 2,78% seng. Perusahaan memperkirakan perizinan untuk pengeboran eksplorasi dan pengembangan bawah tanah akan memakan waktu 12–18 bulan.
25 Sep 2026 09:58 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
24 Sep 2026 17:22 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Baca Selengkapnya
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
[Permintaan penggunaan akhir buruk, tingkat operasi seng oksida menurun] Dari perspektif kinerja permintaan penggunaan akhir, di sektor seng oksida kelas karet, pesanan perusahaan ban umumnya lemah, dan pembelian seng oksida tetap dilakukan secara tepat waktu; pesanan di bidang desulfurisasi berkinerja buruk, dengan permintaan tetap lesu...
24 Sep 2026 17:22 (GMT+8)