[Pb Output]China Lead Concentrate Output Falls 0.9% YoY in June

Telah Terbit: Jul 28, 2015 13:11 (GMT+8)
China lead concentrate production totaled 1.14 million mt during January-June 2015, down 8.72% YoY. Domestic concentrate output came in at 250,000 mt in June 2015, down 0.9% YoY, according to NBS.

SHANGHAI, Jul. 28 (SMM) - China lead concentrate production totaled 1.14 million mt during January-June 2015, down 8.72% YoY. Domestic concentrate output came in at 250,000 mt in June 2015, down 0.9% YoY, according to China's National Bureau of Statistics. 

SMM attributed H1’s year-on-year large fall in concentrate production to the following reasons:

First, ore suppliers kept low operation rate against sluggish lead and silver prices. SMM #1 lead prices averaged RMB 12,972.9/mt in the first six months of 2015, decreasing RMB 900.8/mt YoY. In the same period, SMM #2 silver prices averaged RMB 3,527.1/kg, down RMB 591.7/kg from January-June 2014.

Second, environmental protection cracks also limited concentrate production at ore suppliers. Lots of mines were closed owing to strict environmental protection inspection in Fujian, Sichuan, Guangxi this year. During January-June, concentrate output fell 79.44% YoY, 62.4% YoY and 33.28% YoY in Fujian, Sichuan and Guangxi, respectively.

Concentrate production dropped 16,000 mt from May in June, resulting from the production drop of 30,000 mt to 113,000 mt in Inner Mongolia. Local large mines kept stable production in June, SMM learnt.

In other regions, concentrate output declined 6,000 mt MoM to 2,000 mt in Sichuan and fell to 14,000 mt in Yunnan in June. The production was up 2,000 mt MoM to 32,000 mt in Hunan thanks to high operation rate at local large mines. The output grew 2,000 mt MoM to 12,000 mt and to 7,000 mt in Guangxi and Gansu, respectively, as some mines recovered from environmental protection cracks.

In June, Shaanxi saw a rise of 2,000 mt MoM to 11,000 mt in concentrate production. The production increased 4,000 mt MoM to 9,000 mt in Tibet, grew to 9,000 mt in Henan and rose to 6,000 mt in Guangdong.

Weak prices of lead and silver dampen production at mines, but more mines plan to resume operation following environmental protection inspections. Thus, lead concentrate output should be set for modest rise in July.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
11 jam yang lalu
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
11 jam yang lalu
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
16 jam yang lalu
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Baca Selengkapnya
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon Metals mengumumkan telah menandatangani perjanjian definitif untuk mengakuisisi 100% deposit VMS tembaga-emas Turner di Oregon dari Gold Coast Mining. Imbalannya terdiri dari US$4,7 juta tunai, 4.778.761 saham Blue Moon senilai sekitar US$27 juta berdasarkan VWAP 20 hari, dan hingga US$7 juta dalam bentuk pencapaian tonggak yang terkait dengan perizinan eksplorasi/pengembangan bawah tanah, izin penambangan, dan produksi komersial. Penutupan transaksi diharapkan pada November 2026, dengan syarat persetujuan TSX Venture Exchange dan kondisi-kondisi lazim. Turner adalah deposit VMS tipe Siprus yang pernah berproduksi dan mengandung tembaga, emas, seng, perak, dan kobalt. Estimasi historis tahun 2010 melaporkan 2,447 juta ton pendek material Terindikasi dengan kadar 2,65% seng dan 2,084 juta ton pendek material Terestimasi dengan kadar 2,78% seng. Perusahaan memperkirakan perizinan untuk pengeboran eksplorasi dan pengembangan bawah tanah akan memakan waktu 12–18 bulan.
16 jam yang lalu
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
24 Sep 2026 17:22 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Baca Selengkapnya
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
[Permintaan penggunaan akhir buruk, tingkat operasi seng oksida menurun] Dari perspektif kinerja permintaan penggunaan akhir, di sektor seng oksida kelas karet, pesanan perusahaan ban umumnya lemah, dan pembelian seng oksida tetap dilakukan secara tepat waktu; pesanan di bidang desulfurisasi berkinerja buruk, dengan permintaan tetap lesu...
24 Sep 2026 17:22 (GMT+8)