Peru metal output rises in April, silver production lags

Telah Terbit: Jun 10, 2015 17:33
The production of almost all major metals by Peru reported robust growth in Peru during the month of April this year.

 Author: Paul Ploumis 

10 Jun 2015 Last updated at 03:27:08 GMT
 
LIMA (Scrap Monster): The production of almost all major metals by Peru reported robust growth in Peru during the month of April this year. While the output of copper, gold and zinc reported significant increase during the month, silver production declined, in accordance with the official government data released yesterday.
 
According to data released by the Energy and Mines Ministry, copper production rose 18.5% from 103,410 mt in April last year to 122,506 mt in Apr ’15. The decline in copper output from Freeport-McMoRan's Cerro Verde was offset by increased mine output from Antamina, Southern Copper, Toromocho and Antapaccay mines.
 
The increased output from Newmont and Barrick gold mines contributed to the 15% growth in gold production during April this year. The gold production totaled 379,504 Oz in Apr ’15, in comparison with the output of 330,273 Oz during the same month a year before.
 
Silver production dropped marginally by 0.4% over the year from 9.57 MOz to 9.53 MOz in April. The output from Antamina mines dropped significantly, whereas Buenaventura and Volcan reported rise in silver production during the month.
 
Zinc production rose 17.7% from 97,128 mt a year before to 114,323 mt in Apr ’15. Lead output too rose 27% from 97,128 mt to 114,323 mt over the previous year. Lead output witnessed sharp increase in Antamina, Volcan and Milpo. Molybdenum output too jumped 45% to 1,632 mt in April 2015.
 
Meantime, tin production by Minsur- the country’s only tin producer, rebounded sharply in April this year, rising nearly 15% from 1,438 mt in April 2014 to 1,654 mt in April this year.
 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Data: Pergerakan pasar SHFE, DCE (7 Sep)
4 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Data: Pergerakan pasar SHFE, DCE (7 Sep)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 07 Sep 2026.
4 jam yang lalu
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
4 jam yang lalu
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Baca Selengkapnya
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek perluasan katoda tembaga 300.000 ton/tahun milik JCC Hongyuan Copper, anak perusahaan Jiangxi Copper Corporation, memasuki tahap pengumuman publik pra-persetujuan penilaian dampak lingkungan pada 4 September, dengan total investasi sekitar 1,416 miliar yuan. Proyek ini direncanakan mulai dibangun pada September 2026 dan selesai pada Desember 2027. Setelah selesai, total kapasitas JCC Hongyuan akan melonjak dari 250.000 ton menjadi 550.000 ton.
4 jam yang lalu
Panoro Menembus Mineralisasi Tembaga-Emas 808,2 m di Proyek Cotabambas, Peru
4 jam yang lalu
Panoro Menembus Mineralisasi Tembaga-Emas 808,2 m di Proyek Cotabambas, Peru
Baca Selengkapnya
Panoro Menembus Mineralisasi Tembaga-Emas 808,2 m di Proyek Cotabambas, Peru
Panoro Menembus Mineralisasi Tembaga-Emas 808,2 m di Proyek Cotabambas, Peru
Panoro Minerals telah melaporkan hasil pengujian terbaru dari proyek tembaga-emas-perak Cotabambas di Peru selatan, dengan lubang bor CB-230 memotong 808,15 meter dengan kadar 0,22% tembaga, 0,10 g/t emas, dan 1,53 g/t perak, setara dengan 0,31% CuEq menggunakan asumsi harga logam dan pemulihan metalurgi yang ditetapkan Panoro. Interval tersebut ditemukan dari kedalaman 296,35 meter hingga 1.104,50 meter di bawah permukaan. Di dalam interval mineralisasi yang lebih luas, CB-230 menghasilkan 240,15 meter dengan kadar 0,32% tembaga, termasuk 156,50 meter dengan kadar 0,38% tembaga dan interval berkadar lebih tinggi sepanjang 48,10 meter dengan kadar 0,57% tembaga, 0,25 g/t emas, dan 4,08 g/t perak. Lubang bor CB-229 secara terpisah memotong 303,30 meter dengan kadar 0,14% tembaga, termasuk 69,90 meter dengan kadar 0,27% tembaga. Panoro menyatakan bahwa pengeboran terbaru, bersama dengan lubang CB-228 yang telah dilaporkan sebelumnya, menunjukkan kontinuitas mineralisasi berkadar lebih tinggi di sepanjang sekitar 600 meter strike dan dari permukaan hingga kedalaman lebih dari 1.100 meter. Mineralisasi masih terbuka, dan lubang tambahan CB-231, CB-232, dan CB-233 telah dimulai untuk menguji perluasan lebih lanjut di sekitar dan di bawah South Pit. Hasil terbaru ini memperkuat dasar geologi Panoro untuk memperluas komponen berkadar lebih tinggi dari sumber daya Cotabambas, terutama karena pengeboran belum menentukan batas mineralisasi di sekitar South Pit. Cotabambas saat ini memiliki 507,3 Mt sumber daya terindikasi dan 496,0 Mt sumber daya tereka, dengan komponen berkadar lebih tinggi sebesar 129,0 Mt terindikasi dan 93,1 Mt tereka. Namun, proyek ini masih berada pada tahap eksplorasi dan pengembangan, yang berarti perpotongan baru ini tidak berdampak langsung pada pasokan tembaga dan perlu dimasukkan ke dalam pemodelan sumber daya serta studi teknis di masa mendatang sebelum signifikansi ekonominya dapat dinilai.
4 jam yang lalu
Peru metal output rises in April, silver production lags - Shanghai Metals Market (SMM)