China Refined Lead Output Drops 2.42% MoM in April

Telah Terbit: Jun 04, 2015 10:45 (GMT+8)
NBS reported that China’s refined lead output dropped 2.42% MoM in April to 332,000 mt, and the output through the first four months declined 4.53% to 1.3 million mt.

SHANGHAI, jUN. 4 (SMM) - NBS reported that China’s refined lead output dropped 2.42% MoM in April to 332,000 mt, and the output through the first four months declined 4.53% to 1.3 million mt.

Output of primary lead slipped 0.85% on the month to 238,700 mt. SMM survey indicates a 4.01-percentage-point slide in operating rate at primary lead smelters in April mainly caused by maintenance operations.

Primary lead output in Henan, Hunan and Jiangxi was 119,000 mt, 85,000 mt and 17,000 mt, respectively, up 0.62%, 7.33% and 14.9% on the month. Yunnan witnessed a 23.75% decline in output to 20,000 mt in April, because, Zhenxing Lead and Chihong Zn & Ge halted production. Henan’s Yuguang Gold & Lead, Jinli Gold & Lead and Shibin Lead conducted maintenance in April, but Zhicheng Lead and Xinling Smelting restarted operations. In Hunan, Zhantai Nonferrous Metals reopened and Jingui Silver’s production recovered slightly. Jiangxi Copper’s lead facility was running normally in April, but Jiangxi’s Jinde Lead conducted maintenance. Maintenance of Guangxi’s Chengyuan Nonferrous, Nanfang Nonferrous, and Shaanxi’s Hanzhong Zinc and Dongling Nonferrous led to a 60% fall in combined output in the two regions.

Output of non-primary lead fell by 6.23% MoM in April to 93,200 mt. Secondary lead output in Jiangsu increased 62% to 16,000 mt and that in Hubei dropped 47% to 16,000 mt. SMM survey shows the average operating rate at major secondary lead smelters grew 6.39 percentage points to 40.83% in April. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
02 Oct 2026 15:49 (GMT+8)
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Baca Selengkapnya
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
Rancangan undang-undang Ghana mengusulkan saham khusus negara dan sewa pertambangan yang lebih singkat
[SMM Kilasan Emas] Rancangan undang-undang pertambangan yang ditinjau Reuters pada 30 September akan memungkinkan menteri pertambangan Ghana mewajibkan perusahaan menerbitkan saham khusus gratis kepada negara dengan hak persetujuan atas transaksi besar. RUU itu akan mempertahankan kepentingan negara 10% yang ditanggung gratis dan membatasi sewa pertambangan hingga 15 tahun atau umur tambang yang diproyeksikan, mana yang lebih pendek. Rancangan itu juga akan memungkinkan aturan di masa depan yang mewajibkan pemrosesan lokal dan membatasi ekspor konsentrat yang belum diproses. Tak satu pun dari proposal ini telah diberlakukan; Reuters tidak dapat memastikan kapan rancangan itu disusun. Bagi para penambang emas Ghana, hak yang diusulkan dan sewa yang lebih pendek dapat memengaruhi pembiayaan, valuasi, dan keputusan perpanjangan. Berdasarkan rancangan itu, pemegang hak yang ada yang mencari perpanjangan akan menerima pertimbangan prioritas untuk lisensi yang setara. Perusahaan pertambangan mengharapkan konsultasi lebih lanjut sebelum pembahasan di parlemen, lapor Reuters. Kata-kata akhir dan waktunya masih belum pasti.
02 Oct 2026 15:49 (GMT+8)
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
02 Oct 2026 15:48 (GMT+8)
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
Baca Selengkapnya
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
PGM: Uji independen memajukan teknologi baterai platinum dan paladium
[SMM PGM Flash] Platinum Group Metals menyatakan pada 1 Oktober bahwa pengujian independen oleh Battery Innovation Center telah memvalidasi elektroda berbasis platinum dan paladium milik anak perusahaannya, Lion Battery, dalam sel prototipe litium-sulfur. Dibandingkan dengan sel tanpa katalis, prototipe tersebut menunjukkan kapasitas dan kemampuan laju yang lebih baik, dengan formulasi kaya paladium berkinerja terbaik secara keseluruhan. Platinum Group dan Valterra Platinum, yang masing-masing memiliki 52% dan 48% saham Lion, telah menyetujui pendanaan untuk tahap berikutnya. Hasil ini menawarkan kemungkinan penggunaan baru untuk PGM di luar katalis knalpot kendaraan, tetapi masih merupakan tonggak prototipe. Lion berencana membuat dan menguji sel kantong, menyempurnakan katalis, dan menilai aplikasi termasuk drone. Kinerja komersial dan permintaan untuk volume PGM yang signifikan belum terbukti. Pekerjaan ini relevan bagi pemasok Afrika Selatan: Valterra memproduksi PGM di Afrika Selatan dan Zimbabwe, sementara Platinum Group sedang mengembangkan proyek Waterberg di Afrika Selatan.
02 Oct 2026 15:48 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
01 Oct 2026 16:45 (GMT+8)
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Baca Selengkapnya
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
Sibanye mencapai kesepakatan upah East Boulder; mogok kerja terpisah di AS berlanjut
[SMM PGM Flash] Sibanye-Stillwater mengumumkan pada 30 September bahwa para pekerja di tambang platinum dan paladium East Boulder miliknya di Montana telah meratifikasi perjanjian kerja bersama dengan United Steelworkers. Kesepakatan tersebut berlaku surut sejak 1 Agustus 2026 hingga 31 Juli 2029, dengan kenaikan upah 4,5% pada tahun pertama, mana yang lebih besar antara 3,5% atau IHK pada tahun kedua, dan mana yang lebih besar antara 3,0% atau IHK pada tahun ketiga. Aksi mogok di tambang Stillwater East yang terpisah dan fasilitas metalurgi Columbus masih berlanjut, kata perusahaan tersebut. Penyelesaian di East Boulder menetapkan sebagian jalur biaya tenaga kerja untuk bisnis PGM Sibanye di AS dan mendukung rencana peralihannya menuju penambangan yang lebih termekanisasi dan insentif berbasis tim. Hal ini tidak menyelesaikan pemogokan lainnya atau menunjukkan pemulihan produksi; perusahaan tidak mengungkapkan revisi panduan produksi dalam rilis ini.
01 Oct 2026 16:45 (GMT+8)