Global Lead mine supply exceeded demand by 11 kt during Q1 2015

Telah Terbit: May 19, 2015 16:22
The International Lead and Zinc Study Group (ILZSG) has released the preliminary data for world lead supply and demand during the first quarter of 2015.

Author: Paul Ploumis
19 May 2015 Last updated at 03:26:18 GMT
SEATTLE (Scrap Monster): The International Lead and Zinc Study Group (ILZSG) has released the preliminary data for world lead supply and demand during the first quarter of 2015. The provisional data indicates that the lead mine supply has marginally declined by almost 0.9% year-on-year during the initial three month period of the year.

According to ILZSG, the world supply of refined lead metal exceeded demand by 11kt during the first quarter of the year. The total reported stock levels dropped by 10 kt during the period. Meantime, LME stock levels rose during Jan-Mar ’15.

The overall lead mine supply during Q1 2015 totaled 1.146 million tons, in comparison with 1.156 million tons during Q1 last year. The falling mine output from Australia has contributed to the 0.9% year-on-year decline in global lead mine supply. On the other hand, the mine supply from Peru and the US increased during the quarter.

The global refined lead metal production declined by 2.3% during Q1 this year. This was primarily on account of lowered production from China and disruption of operations at La Oroya plant in Peru during the month of June last year.

The global demand for refined lead metal witnessed a decline of 2.7% during the quarter. The apparent usage of refined metal by China and the US fell by 4.6% and 6.2% respectively. The apparent lead usage by the European region too dropped by 2.5%.

ILZSG statistics indicate that the lead mine supply during the month of March alone totaled 379,300 tonnes. The global refined lead metal production during the month totaled 859,100 tonnes. The apparent lead usage totaled 854,600 tonnes during March this year.
 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Senyawa Platinum & Paladium Mingguan: Pengiriman Spot Lebih Cepat, Pemulihan Otomotif Domestik Moderat
2 jam yang lalu
Senyawa Platinum & Paladium Mingguan: Pengiriman Spot Lebih Cepat, Pemulihan Otomotif Domestik Moderat
Baca Selengkapnya
Senyawa Platinum & Paladium Mingguan: Pengiriman Spot Lebih Cepat, Pemulihan Otomotif Domestik Moderat
Senyawa Platinum & Paladium Mingguan: Pengiriman Spot Lebih Cepat, Pemulihan Otomotif Domestik Moderat
2 jam yang lalu
Bank Sentral AS dengan Suara Bulat Menaikkan Suku Bunga, Logam Mulia Menghadapi Tekanan Turun
2 jam yang lalu
Bank Sentral AS dengan Suara Bulat Menaikkan Suku Bunga, Logam Mulia Menghadapi Tekanan Turun
Baca Selengkapnya
Bank Sentral AS dengan Suara Bulat Menaikkan Suku Bunga, Logam Mulia Menghadapi Tekanan Turun
Bank Sentral AS dengan Suara Bulat Menaikkan Suku Bunga, Logam Mulia Menghadapi Tekanan Turun
**Berita SMM, 17 September:** Semalam, anggota Federal Reserve dengan suara bulat mendukung kenaikan suku bunga, hasil yang jarang terjadi, dan kenaikan suku bunga berturut-turut lebih lanjut masih mungkin terjadi. Logam mulia berada di bawah tekanan penurunan yang berkelanjutan akibat berita kenaikan suku bunga, memicu penurunan mendadak harga rhodium setelah kenaikan sebelumnya. Beberapa pelaku pasar mencatat bahwa likuiditas penjualan telah mengering secara signifikan selama dua hari terakhir, dan likuidasi paksa pada harga yang lebih rendah menyebabkan rhodium jatuh tajam.
2 jam yang lalu
Bravo Mining Melaporkan Intersepsi PGM-Nikel Tebal di Proyek Luanga, Brasil
2 jam yang lalu
Bravo Mining Melaporkan Intersepsi PGM-Nikel Tebal di Proyek Luanga, Brasil
Baca Selengkapnya
Bravo Mining Melaporkan Intersepsi PGM-Nikel Tebal di Proyek Luanga, Brasil
Bravo Mining Melaporkan Intersepsi PGM-Nikel Tebal di Proyek Luanga, Brasil
[SMM Flash] Bravo Mining telah melaporkan hasil pengeboran infill dan step-out lebih lanjut dari proyek paladium-platina-rodium-emas-nikel Luanga yang 100% dimilikinya di Pará, Brasil. Hasil dari Sektor Tengah mencakup 53,85 m dengan kadar 2,83 g/t PGM+Au dan 0,16% Ni, termasuk 5,01 m dengan kadar 10,68 g/t PGM+Au dan 0,40% Ni. Intersepsi lainnya mencakup 39,75 m dengan kadar 3,02 g/t PGM+Au dan 0,32% Ni serta 52,45 m dengan kadar 2,06 g/t PGM+Au dan 0,11% Ni. Bravo menyatakan bahwa pengeboran terbaru menunjukkan kontinuitas mineralisasi di kedalaman dan memberikan potensi untuk memperluas serta meningkatkan sumber daya Luanga yang ada. Hasil dari program yang sedang berjalan diharapkan dapat mendukung estimasi sumber daya mineral terbaru yang ditargetkan pada kuartal pertama 2027. Kombinasi paladium, platina, rodium, dan nikel di Luanga menjadikan proyek ini relevan untuk diversifikasi geografis pasokan PGM di masa depan. Namun, hasil terbaru ini merupakan intersepsi eksplorasi dan bukan merupakan cadangan mineral atau panduan produksi di masa depan.
2 jam yang lalu