Newssummary: Yunnan Hualian Zinc&Indium 8,000-tonne Daily Ore Dressing Project Passes Environmental Tests

Telah Terbit: May 13, 2015 16:01 (GMT+8)
Yunnan Hualian Zinc&Indium Co.,’s 8,000-tonne daily ore dressing project was recently examined and accepted by the Yunnan Environmental Protection Bureau, the company’s website reported.

SHANGHAI, May 13 (SMM) - Yunnan Hualian Zinc&Indium Co.,’s 8,000-tonne daily ore dressing project was recently examined and accepted by the Yunnan Environmental Protection Bureau, the company’s website reported.

The expansion project is located in Yunnan’s Dulong mineral deposit.
 

 
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
5 jam yang lalu
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Baca Selengkapnya
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
[SMM Berita Kilat] South32 Merevisi Penawaran Premium CIF MJP Kuartal IV '26 menjadi US$265/mt
Sumber pasar melaporkan: South32 merevisi penawaran Premium CIF MJP Q4 '26 menjadi US$265/mt, turun dari US$325/mt. Berlaku hingga 5 Oktober 2026.
5 jam yang lalu
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
23 jam yang lalu
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Baca Selengkapnya
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
India ADC 12 Bertahan Stabil saat Aluminium LME Turun; Pasokan Skrap yang Ketat Membatasi Penurunan
Harga ADC 12 India tetap relatif stabil meskipun harga aluminium LME 3 bulan turun 1,2% antara 24 dan 30 September.
23 jam yang lalu
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
23 jam yang lalu
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Baca Selengkapnya
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto Amankan Operasi Smelter Bell Bay Hingga Akhir 2031
Rio Tinto mengumumkan pada 1 Oktober bahwa mereka telah mencapai kesepakatan dengan Pemerintah Tasmania, Pemerintah Persemakmuran Australia, dan Hydro Tasmania untuk memperpanjang pasokan listrik ke smelter aluminium Bell Bay hingga akhir 2031. Kedua pemerintah juga akan memberikan paket dukungan gabungan sebesar A$200 juta selama lima tahun, masing-masing menyumbang A$100 juta. Ketentuan komersial dari perjanjian listrik tersebut tidak diungkapkan. Bell Bay memproduksi sekitar 190.000 ton aluminium primer per tahun, sementara kontrak listriknya yang ada akan berakhir pada akhir 2026. Kesepakatan ini menghilangkan ketidakpastian operasional langsung smelter tersebut. Bell Bay menjadi smelter aluminium besar ketiga di Australia yang menerima dukungan yang didukung pemerintah pada 2026, setelah Boyne dan Tomago, menyoroti tekanan berkelanjutan dari biaya listrik yang tinggi dan persaingan internasional.
23 jam yang lalu