Gold Reserves of Major Miners on the Decline

Telah Terbit: May 12, 2015 11:24 (GMT+8)
Mineweb’s Kip Keen published an article that looks at the reserves of major gold miners.
Monday May 11, 2015, 10:55am PDT
Mineweb’s Kip Keen published an article that looks at the reserves of major gold miners. All in all, he states, “[t]he trend is clear. Gold reserves are sliding for top miners.” Specifically, proven and probable gold reserves for the top five gold miners fell 14 percent from 2013 to 2014.
As quoted in the market news:
 
None registered reserve gains. The reserve declines ranged between 9% to 20% and absolutely speaking between 5 million and 11 million ounces gold. This year you couldn’t blame the price of gold. Within house, all the top five gold miners used the same price assumptions in 2014 as 2013 in calculating their own reserves. So changes to gold reserves reflected asset sales and depletion more than they have in recent years when the changing price of gold bloated or shrunk the amount of mineralised rock considered ore.
 
Absolutely, in terms of ounces gold, the worst among the top five major gold miners was Newmont, with a 17-million ounce decline in reserves. That was down 17% relative to the year previous. Thereafter came Barrick (down 11 million ounces), AngloGold (down 10 million ounces), Kinross (down 8 million ounces) and then Goldcorp (down 5 million ounces).
 
Percentage wise Kinross’ decline was the worst at 20%, followed by Newmont (down 17%), AngloGold (down 15%), Barrick (down 11%) and then Goldcorp (down 9%).
 
Click here to read the full Mineweb report.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
17 jam yang lalu
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
Baca Selengkapnya
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
【Flash | Mesin Optik AI Terintegrasi InP Mulai Dikirim Massal】
NewPhotonics dan Tower Semiconductor mengumumkan pengiriman volume tinggi mesin optik terintegrasi laser untuk infrastruktur AI. PIC 800G dan 1,6T menggunakan platform fotonik silikon PH18DA Tower dengan komponen InP yang terintegrasi secara heterogen, memungkinkan laser, SOA, modulator, dan fotodetektor dalam satu chip. Pengiriman volume chipset NPO 6,4T direncanakan pada H1 2027. SMM meyakini ini menandakan permintaan interkoneksi optik AI diterjemahkan menjadi permintaan perangkat InP, mendukung konsumsi indium kemurnian tinggi. Namun, volume pengiriman dan intensitas InP tidak diungkapkan, sehingga peningkatan indium jangka pendek belum dapat diukur.
17 jam yang lalu
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
22 jam yang lalu
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Baca Selengkapnya
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon akan mengakuisisi deposit VMS tembaga-emas-seng Turner dengan sumber daya seng historis
Blue Moon Metals mengumumkan telah menandatangani perjanjian definitif untuk mengakuisisi 100% deposit VMS tembaga-emas Turner di Oregon dari Gold Coast Mining. Imbalannya terdiri dari US$4,7 juta tunai, 4.778.761 saham Blue Moon senilai sekitar US$27 juta berdasarkan VWAP 20 hari, dan hingga US$7 juta dalam bentuk pencapaian tonggak yang terkait dengan perizinan eksplorasi/pengembangan bawah tanah, izin penambangan, dan produksi komersial. Penutupan transaksi diharapkan pada November 2026, dengan syarat persetujuan TSX Venture Exchange dan kondisi-kondisi lazim. Turner adalah deposit VMS tipe Siprus yang pernah berproduksi dan mengandung tembaga, emas, seng, perak, dan kobalt. Estimasi historis tahun 2010 melaporkan 2,447 juta ton pendek material Terindikasi dengan kadar 2,65% seng dan 2,084 juta ton pendek material Terestimasi dengan kadar 2,78% seng. Perusahaan memperkirakan perizinan untuk pengeboran eksplorasi dan pengembangan bawah tanah akan memakan waktu 12–18 bulan.
22 jam yang lalu
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
24 Sep 2026 17:22 (GMT+8)
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Baca Selengkapnya
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
Tinjauan Mingguan Seng Oksida SMM: Permintaan penggunaan akhir menurun, tingkat operasi seng oksida menurun
[Permintaan penggunaan akhir buruk, tingkat operasi seng oksida menurun] Dari perspektif kinerja permintaan penggunaan akhir, di sektor seng oksida kelas karet, pesanan perusahaan ban umumnya lemah, dan pembelian seng oksida tetap dilakukan secara tepat waktu; pesanan di bidang desulfurisasi berkinerja buruk, dengan permintaan tetap lesu...
24 Sep 2026 17:22 (GMT+8)