[SMM PV News] Saudi Arabia Adds 7.8 GW of Solar in 2025

Published: Mar 26, 2026 13:21
Saudi Arabia installed a record-breaking 7.8 GW of solar capacity in 2025, bringing its cumulative solar total to an estimated 12.4 GW. While this cements solar as the nation's dominant renewable source, analysts at 'GlobalData' warn the current growth trajectory falls short of the 130 GW required by the 'Vision 2030' target, which demands over 23 GW of annual additions. To close this gap, experts urge the kingdom to implement standardized 'PPAs', streamline permitting, and heavily invest in grid flexibility and solar-plus-storage. Notably, the Saudi Power Procurement Company recently signed a massive 15 GW renewable energy deal (including 12 GW of solar) to accelerate future deployment.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Apr 3, 2026 17:53
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Read More
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Recent 'EIA' data shows rooftop solar now makes up 20% of Puerto Rico's power capacity (1,456 MW), surpassing natural gas as the second-largest source. Between 2016 and 2025, distributed solar accounted for 81% of all new capacity. To combat frequent grid outages, residents have deployed over 171,000 battery systems (2,864 MWh), with many joining grid operator LUMA's virtual power plant ('VPP') program. Despite this progress, new legislation extended the territory's sole coal plant to 2032 and removed interim renewable targets, though the 100% goal for 2050 remains.
Apr 3, 2026 17:53
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Apr 3, 2026 09:59
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Read More
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
The US solar industry faces a 53,000-worker shortfall as developers rush to meet the July 2026 construction deadline under the 'OBBBA'. Projections indicate 355,000 workers are needed to hit the 60-70 GW installation targets, yet 86% of employers report hiring difficulties. The labor crunch is compounded by a mandate requiring 15% of labor hours to come from apprentices to secure tax credits. To adapt, developers are building internal training pipelines, targeting veterans, and utilizing digital tools to maximize efficiency.
Apr 3, 2026 09:59
Saudi Arabia installed a record-breaking 7.8 GW of solar capacity in 2 - Shanghai Metals Market (SMM)