[Energy Storage: EPC Tender For Grid-Forming Hybrid Independent Energy Storage Station In Yanchang County, Shaanxi]

Published: May 20, 2026 18:50
On May 18, the engineering, procurement, and construction (EPC) tender for the Yanchang County grid-side energy storage station project was released. The project is located in Yanchang County, Yan'an City, Shaanxi Province, with a total investment of 580 million yuan and a planned construction period of 180 calendar days. This project is a grid-side grid-forming independent energy storage station with a total scale of 200MW/400MWh. The energy storage system adopts a hybrid technology route consisting of 190MW/380MWh lithium iron phosphate batteries + 10MW/20MWh all-vanadium redox flow batteries. A new 110kV booster station will be constructed simultaneously, which is planned to connect to the 110kV side of the 330kV Fushi substation via a single transmission line.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Energy Storage: REPT BATTERO Secures 2GWh Cell Order From Eigongpin]
3 hours ago
[Energy Storage: REPT BATTERO Secures 2GWh Cell Order From Eigongpin]
Read More
[Energy Storage: REPT BATTERO Secures 2GWh Cell Order From Eigongpin]
[Energy Storage: REPT BATTERO Secures 2GWh Cell Order From Eigongpin]
On the afternoon of May 14, REPT BATTERO Energy Co., Ltd. and Guangzhou Eigongpin Trading Co., Ltd. formally signed a framework cooperation agreement for cell procurement. The two parties reached an annual procurement agreement for 2GWh covering energy storage cells and power cells, laying a solid foundation for subsequent in-depth cooperation. In the future, REPT BATTERO will adhere to technology-driven principles, continuously increasing research and development efforts in both the power and energy storage sectors, and is committed to providing safer, more efficient, and more reliable energy solutions to global customers.
3 hours ago
HyVISION System wins KRW 19.1 billion ESS equipment supply contract, expands U.S. business
May 13, 2026 15:29
HyVISION System wins KRW 19.1 billion ESS equipment supply contract, expands U.S. business
Read More
HyVISION System wins KRW 19.1 billion ESS equipment supply contract, expands U.S. business
HyVISION System wins KRW 19.1 billion ESS equipment supply contract, expands U.S. business
HyVISION System disclosed on May 8, 2026 that it signed a single sales and supply contract worth KRW 19.1 billion with the overseas subsidiary of a U.S.-based secondary battery company. The contract covers the supply of battery pack assembly equipment for energy storage systems (ESS).
May 13, 2026 15:29
[Lithium Battery: New Ultra-Fast Charging Battery Industrialization Project To Be Launched In Zaozhuang, Shandong]
May 6, 2026 14:02
[Lithium Battery: New Ultra-Fast Charging Battery Industrialization Project To Be Launched In Zaozhuang, Shandong]
Read More
[Lithium Battery: New Ultra-Fast Charging Battery Industrialization Project To Be Launched In Zaozhuang, Shandong]
[Lithium Battery: New Ultra-Fast Charging Battery Industrialization Project To Be Launched In Zaozhuang, Shandong]
Recently, the Ecological Environment Branch of Zaozhuang High-tech Zone approved the environmental impact assessment documents for the new ultra-fast charging battery industrialization project of Shandong Xinbang New Energy Co., Ltd., giving the green light for construction. The project plans to construct electrode production workshops, cell workshops, formation and capacity grading workshops, module workshops, comprehensive warehouses, hazardous waste warehouses, a wastewater treatment station, and other supporting facilities. The main products will be energy storage battery packs and power batteries for new energy vehicles. The overall plant plans to include 2 ESS production lines, 3 BEV production lines, and 8 PACK production lines, with a planned total capacity of approximately 52 GWh.
May 6, 2026 14:02