[SMM Announcement] Launch of New Price Points for TOPCon Module, Rotterdam, Portugal and Greece in-warehouse, Duty Paid Price for Distributed and Utility Projects

Published: May 11, 2026 16:42
Source: SMM
SMM will launch the price points for TOPCon module Rotterdam, Portugal and Greece in-warehouse, duty paid price for distributed and utility projects.

Dear Users,

The photovoltaic industry is currently accelerating its transition toward N-type technology. TOPCon modules, with their superior power density, have become the core demand in major global markets. As one of the world's largest PV terminal markets, Europe's installed capacity base and long-term decarbonization goals determine its central position in the global supply chain.

Against the backdrop of TOPCon becoming a rigid demand in the European market, accurately grasping the actual landing costs in local regions has become crucial. Given the increasing complexity of the global trade environment and fluctuations in international logistics costs, simple Free on Board (FOB) prices can no longer meet the needs of the industry chain for precise calculation of overseas final delivery costs. The In-warehouse Duty Paid (DP) price provides the most intuitive reflection of a product's actual competitiveness in the European terminal market, playing an increasingly important role as a basis for trade settlement and risk hedging.

To better understand the authentic delivery market of module exports to Europe and to help enterprises reduce transaction risks and costs under complex trade backgrounds, SMM, after extensive research, will officially launch the following TOPCon Module In-warehouse DP prices for European regions on May 22, 2026:

  • TOPCon Module: Distributed Projects (470w-480w) - in-whs dp Rotterdam

  • TOPCon Module: Distributed Projects (470w-480w) - in-whs dp Portugal

  • TOPCon Module: Distributed Projects (470w-480w) - in-whs dp Greece

  • TOPCon Module: Distributed Projects (620w-640w) - in-whs dp Rotterdam

  • TOPCon Module: Distributed Projects (620w-640w) - in-whs dp Portugal

  • TOPCon Module: Distributed Projects (620w-640w) - in-whs dp Greece

  • TOPCon Module: Utility Projects (620w-640w) - in-whs dp Rotterdam

  • TOPCon Module: Utility Projects (620w-640w) - in-whs dp Portugal

  • TOPCon Module: Utility Projects (620w-640w) - in-whs dp Greece

  • TOPCon Module: Utility Projects (710w-730w) - in-whs dp Rotterdam

  • TOPCon Module: Utility Projects (710w-730w) - in-whs dp Portugal

  • TOPCon Module: Utility Projects (710w-730w) - in-whs dp Greece

The prices to be released cover the main regions of Rotterdam, Portugal, and Greece for In-warehouse DP delivery, including both distributed and utility projects. The specific specifications and descriptions are as follows:

Price Specifications:

  • Price Type: In-warehouse, Duty Paid (DP) for Rotterdam, Portugal, and Greece.

  • Tax Standard: Excluding VAT.

  • Definition: Delivery after duty paid at major ports/warehouses in Rotterdam, Portugal, and Greece.

  • Unit: Euro/Watt (EUR/W).

  • Tier 1 Brands: LONGi, Jinko, JA Solar, Trina, TW Solar, etc.

  • Minimum Transaction Volume (Distributed): 1MW.

  • Minimum Transaction Volume (Utility): 5MW.

  • Delivery Lead Time (Distributed): Within 3 months.

  • Delivery Lead Time (Utility): Within 6 months.

  • Publication Time: Every Friday at 11:00 AM CET (Central European Time).

  • Payment Terms: Cash, and other payment methods standardized as cash.

SMM PV Research Team

May 11, 2026

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn