Panchangte Open Inquiry and Comparison Procurement Tender for Molybdenum Bars in May 2026

Published: Apr 30, 2026 11:18

1 Procurement Conditions

The procurement project, Panchangte May 2026 Molybdenum Bar Open Inquiry and Comparison (PGWZMYHGXHD260429285330), is procured by the Materials Division of Pangang Group Materials Trading Co., Ltd. The project funds are self-raised. The project has met the procurement conditions, and an open inquiry and comparison is now conducted.

2 Project Overview and Procurement Scope

2.1 Project Name: Panchangte May 2026 Molybdenum Bar Open Inquiry and Comparison

2.2 Procurement failure to be converted to other procurement methods: converted to negotiated procurement

2.3 The procurement content, scope, and scale of this project are detailed in the attachment "Material List Attachment.pdf".

3 Bidder Qualification Requirements

3.1 Joint venture bidding is not permitted for this procurement.

3.2 Bidders for this procurement shall possess the following qualification requirements:

(1) Manufacturing-type business license

3.3 Bidders for this procurement shall meet the following registered capital requirements:

Registered capital for manufacturing-type enterprises: 5 million yuan and above

3.4 Bidders for this procurement shall meet the following performance requirements:

When submitting bids, bidders shall provide performance certificates (scanned copies of invoices) for similar products from January 1, 2023 to the bid submission deadline.

3.5 Bidders for this procurement shall meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: See attachments for details (if applicable)

Capability requirements: Provide valid enterprise qualification certificates: scanned copies of the original or duplicate business license.

Other requirements: See attachments for details (if applicable)

3.6 For projects subject to mandatory tender by law in this procurement, bids from persons subject to enforcement for breach of trust shall be invalid.

4 Obtaining Procurement Documents

4.1 All parties interested in bidding shall log in to the Ansteel Smart Tender and Bid Platform at http://bid.ansteel.cn to download electronic procurement documents from 10:00 on April 30, 2026 to 08:45 on May 9, 2026 (Beijing time, the same hereinafter).

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Construction Material Total Inventory Destocking Accelerated This Week
1 hour ago
[SMM Analysis] Construction Material Total Inventory Destocking Accelerated This Week
Read More
[SMM Analysis] Construction Material Total Inventory Destocking Accelerated This Week
[SMM Analysis] Construction Material Total Inventory Destocking Accelerated This Week
According to SMM statistics, both mill inventory and social inventory continued destocking, with total construction material inventory at 8.519 million mt, down 467,800 mt WoW (-5.20%), with the destocking slope accelerating.
1 hour ago
Pre-Labour Day Holiday Restocking and Stockpiling, Suppliers' Offers Remained Firm, Magnesium Prices Rose for Two Consecutive Days [SMM Commentary]
3 hours ago
Pre-Labour Day Holiday Restocking and Stockpiling, Suppliers' Offers Remained Firm, Magnesium Prices Rose for Two Consecutive Days [SMM Commentary]
Read More
Pre-Labour Day Holiday Restocking and Stockpiling, Suppliers' Offers Remained Firm, Magnesium Prices Rose for Two Consecutive Days [SMM Commentary]
Pre-Labour Day Holiday Restocking and Stockpiling, Suppliers' Offers Remained Firm, Magnesium Prices Rose for Two Consecutive Days [SMM Commentary]
3 hours ago
[SMM Steel] Structural constraints slow India’s transition toward green steel
17 hours ago
[SMM Steel] Structural constraints slow India’s transition toward green steel
Read More
[SMM Steel] Structural constraints slow India’s transition toward green steel
[SMM Steel] Structural constraints slow India’s transition toward green steel
[SMM Steel] India’s push toward green steel faces significant practical challenges despite strong policy ambitions. Scrap-based production via EAF/IF is seen as the most viable near-term pathway, but logistics disruptions, high freight costs, and reduced scrap exports from Europe are tightening supply conditions. Moreover, scrap alone cannot meet the requirements for high-grade flat steel production, limiting its role in full decarbonisation. While hydrogen-based DRI offers long-term potential, adoption remains limited. As a result, most new capacity still relies on coal-based production, indicating that India’s green steel transition will likely remain gradual, dependent on improvements in scrap supply chains and clean energy availability.
17 hours ago