MMG Q1 2026: Zinc Ore Production Down 3% YoY, Dugald River Steady Despite Challenges

Published: Apr 22, 2026 13:44
[MMG Q1 2026 Report Released] MMG released its Q1 2026 report. Its zinc ore production in the quarter was 50,200 mt, down 3% YoY. By mine, Dugald River's Q1 zinc concentrates production was 41,100 mt, basically flat YoY despite severe flooding and railway disruptions in January and February, thanks to higher throughput, recovery rates, and ongoing beneficiation plant optimization. Rosebery's Q1 zinc concentrates production was 9,100 mt, down 16% YoY, mainly attributable to lower zinc grade and a slight decline in recovery rates, in line with the planned mining sequence as operations advance into deeper areas of the ore body.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
High Zinc Slag Payables: How Will It Trend Going Forward? [SMM Analysis]
52 mins ago
High Zinc Slag Payables: How Will It Trend Going Forward? [SMM Analysis]
Read More
High Zinc Slag Payables: How Will It Trend Going Forward? [SMM Analysis]
High Zinc Slag Payables: How Will It Trend Going Forward? [SMM Analysis]
SMM, April 22: According to SMM, zinc slag payables have remained at elevated levels. What are the reasons behind this? How will they trend going forward?
52 mins ago
Xingye Silver&Tin Reports 11.63% Zinc, 12.96% Lead Production Growth in 2025 Annual Report
1 hour ago
Xingye Silver&Tin Reports 11.63% Zinc, 12.96% Lead Production Growth in 2025 Annual Report
Read More
Xingye Silver&Tin Reports 11.63% Zinc, 12.96% Lead Production Growth in 2025 Annual Report
Xingye Silver&Tin Reports 11.63% Zinc, 12.96% Lead Production Growth in 2025 Annual Report
[Xingye Silver&Tin Released 2025 Annual Report] On April 22, Xingye Silver&Tin released its 2025 annual report. In 2025, the company's ore-derived zinc production totaled 66,600 mt, up 11.63% YoY, and ore-derived lead production totaled 19,100 mt, up 12.96% YoY.
1 hour ago
Zhongjin Lingnan's 2025 Report: Lead-Zinc Output Down, Copper Up; 2026 Targets Set
1 hour ago
Zhongjin Lingnan's 2025 Report: Lead-Zinc Output Down, Copper Up; 2026 Targets Set
Read More
Zhongjin Lingnan's 2025 Report: Lead-Zinc Output Down, Copper Up; 2026 Targets Set
Zhongjin Lingnan's 2025 Report: Lead-Zinc Output Down, Copper Up; 2026 Targets Set
[Zhongjin Lingnan's 2025 Annual Report Released] On April 22, Zhongjin Lingnan released its 2025 annual report. In 2025, the company's mining enterprises produced 253,800 mt of lead-zinc metal content in concentrates, down 4.21% YoY, and 10,255 mt of copper metal content in concentrates, down 14.23% YoY. The company's smelters produced 917,900 mt of copper, lead, and zinc products, up 5.33% YoY, including copper cathode (477,200 mt, up 10.54% YoY) and lead-zinc products (440,700 mt, up 0.22% YoY). In 2026, the company plans to produce 266,400 mt of lead-zinc metal content in concentrates, including lead metal content (73,200 mt) and zinc metal content (193,200 mt), as well as 442,800 mt of lead-zinc products, including lead ingots (124,100 mt) and zinc ingots and zinc products (318,700 mt)
1 hour ago