Financial Report and Business Expansion Plan of LG Energy Solution

Published: Jul 25, 2025 18:57
LG Energy Solution released its Q2 2025 financial results today, showing consolidated revenue of 5.6 trillion Korean won, down 11.2% MoM; operating profit was 492.2 billion Korean won, up 31.4% MoM. LG Energy Solution stated that it would continue to expand its ESS battery business in North America, aiming to achieve an annual capacity of over 30 GWh in North America by the end of 2026. In Europe, the company will commence mass production of low and mid-end battery products, such as high-voltage mid-nickel and LFP batteries, at its Poland plant in H2 this year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yongtai Technology: Subsidiary Signs Electrolyte Cooperation Agreement with CATL
8 mins ago
Yongtai Technology: Subsidiary Signs Electrolyte Cooperation Agreement with CATL
Read More
Yongtai Technology: Subsidiary Signs Electrolyte Cooperation Agreement with CATL
Yongtai Technology: Subsidiary Signs Electrolyte Cooperation Agreement with CATL
Yongtai Technology announced that its wholly-owned subsidiary Yongtai New Energy has signed an Electrolyte Cooperation Agreement with CATL, stipulating that from 2026 to 2028, CATL is expected to procure a total of 470,000 mt of electrolyte from Yongtai New Energy (including fluctuation range), subject to specific orders. The agreement is valid until December 31, 2028, and is expected to positively impact the company's operating results from 2026 to 2028.
8 mins ago
[SMM Flash] Fire Incident at Greenbushes CGP3; CGP1 and CGP2 Unaffected, FY2026 Production Guidance Maintained
46 mins ago
[SMM Flash] Fire Incident at Greenbushes CGP3; CGP1 and CGP2 Unaffected, FY2026 Production Guidance Maintained
Read More
[SMM Flash] Fire Incident at Greenbushes CGP3; CGP1 and CGP2 Unaffected, FY2026 Production Guidance Maintained
[SMM Flash] Fire Incident at Greenbushes CGP3; CGP1 and CGP2 Unaffected, FY2026 Production Guidance Maintained
On June 10, IGO Limited announced that a fire occurred on June 9 at Chemical Grade Plant 3 (CGP3) at the Greenbushes lithium operation. The fire has been extinguished and no injuries were reported. Talison Lithium has commenced a full investigation into the cause of the incident and the extent of the damage. The company will also assess the potential impact and required repairs. According to IGO, operations at Chemical Grade Plant 1 (CGP1) and Chemical Grade Plant 2 (CGP2) remain unaffected. Greenbushes production is still on track to meet IGO’s FY2026 spodumene concentrate guidance of 1.375–1.425 million tonnes. Greenbushes is one of the world’s most important low-cost sources of spodumene concentrate, while CGP3 is an important part of the mine’s incremental chemical-grade concentrate capacity. As CGP1 and CGP2 remain unaffected and IGO has not revised its FY2026 production guidance, the short-term impact on actual global spodumene supply is expected to be limited. However, the extent of the damage, the repair timeline and the recovery schedule for CGP3 should be monitored closely. If the incident materially delays the ramp-up of CGP3, it could affect the pace of Greenbushes’ future supply growth and marginal
46 mins ago
[SMM Hydrogen Cost] 20260610
1 hour ago
[SMM Hydrogen Cost] 20260610
Read More
[SMM Hydrogen Cost] 20260610
[SMM Hydrogen Cost] 20260610
1 hour ago
LG Energy Solution released its Q2 2025 financial results today, showi - Shanghai Metals Market (SMM)