Yibin, Sichuan Launches EPC Tender for Distributed PV & User-side Energy Storage, Settlement Based on Actual Installed Capacity

Published: Sep 12, 2024 16:47
【Settlement Based on Actual Installed Capacity! EPC Tender for Distributed Photovoltaic and User-side Energy Storage Projects in Yibin, Sichuan】SMM has learned that on September 11, Yibin, Sichuan Province, issued an EPC tender for the Demonstration Application of Carbon Neutral Green Energy Distributed Photovoltaic Power Generation and User-side Energy Storage Projects in Xuzhou District. The project plans to build an installed capacity tentatively set at 40MW, with a user-side energy storage capacity of 15MWh. Notably, this project will be settled based on the fixed comprehensive installed price per watt and the fixed comprehensive energy storage price per watt-hour, i.e., according to the actual installed capacity and energy storage capacity on the DC side (regardless of the actual DC-side capacity and energy storage capacity, the fixed comprehensive installed price per watt and the fixed comprehensive energy storage price per watt-hour will not be adjusted). In other words, the total contract settlement price = fixed comprehensive installed price per watt (yuan/Wp) × DC-side capacity (Wp) + fixed comprehensive energy storage price per watt-hour (yuan/Wh) × energy storage capacity (Wh).

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn