NR Electric Secures 90.7 Million Yuan Contract for 135MW/540MWh Energy Storage AC Side and Ancillary Equipment Project in Baotou, Inner Mongolia for Chinalco

Published: Jul 9, 2024 11:10
【NR Electric Wins the Bid for the 135MW/540MWh Energy Storage AC Side and Ancillary Equipment PC Project of Chinalco in Baotou, Inner Mongolia】SMM learned that on July 8, the bid-winning announcement for the PC project of the 135MW/540MWh electrochemical energy storage project (energy storage AC side and ancillary equipment) of the green power supply project for the first phase 900,000 kW wind power project in the renewable energy comprehensive demonstration zone of Baotou Aluminum Industry Industrial Park of Chinalco in Baotou City was released. NR Electric won the bid for the project with a contract value of 90.7 million yuan. The project is located in Baotou, Inner Mongolia, with an extreme low temperature of minus 40 degrees Celsius. In this phase, a set of 135MW/540MWh energy storage system will be constructed at one time, with a battery power capacity ratio (W/Wh) of 0.5C. Lithium iron phosphate batteries are used with an energy storage time of 4 hours.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn