Adaro's KIPI aluminium smelter ramps up for full production by early 2026

Published: Mar 28, 2024 11:00
Amidst the country's lack of sufficient smelters to drive the downstream aluminium sector, Adaro Minerals aims to commence production of 250,000 tonnes of aluminium ingots by the third quarter, with plans to ramp up to full production by early 2026 at its smelter in KIPI, operated by its subsidiary Kalimantan Aluminium Industry.

Amidst the country's lack of sufficient smelters to drive the downstream aluminium sector, Adaro Minerals aims to commence production of 250,000 tonnes of aluminium ingots by the third quarter, with plans to ramp up to full production by early 2026 at its smelter in KIPI, operated by its subsidiary Kalimantan Aluminium Industry.

About the smelter

A US$2 billion aluminium smelter, constructed in Kalimantan Industrial Park Indonesia (KIPI) by PT Adaro Minerals, a coking coal subsidiary of PT Adaro Energy, is set to be fully operational by the first quarter of 2026.

Wito Krisnahadi, director of Adaro Minerals' subsidiary Kalimantan Aluminium Industry, stated that the company intends to sell the smelter's aluminium ingots to domestic and export markets. This move is in response to local demand, which Krisnahadi described as "not that substantial," indicating that it cannot absorb 100 per cent of the output.

250,000 tonnes of ingots

He mentioned that by the third quarter of this year, he anticipates the aluminium smelter will produce 250,000 tonnes of ingots, half of its installed capacity of 500,000 tonnes. Adaro's unit plans a $1.1 billion capital expenditure, primarily allocated for the smelter.

According to Wito, the ingots are part of the government's strategy to advance the downstream aluminium industry. These ingots can be used to create value-added products such as billets, rods, automotive components, and food packaging. Adaro Minerals is currently concentrating on ensuring a consistent, round-the-clock electricity supply for the smelter operation in Bulungan, North Kalimantan.

Source: https://www.alcircle.com/news/adaro-s-kipi-aluminium-smelter-ramps-up-for-full-production-by-early-2026-110281

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Zhongqing Robotics Launches T800 Humanoid Robots, Marking New Era of Mass Production
17 hours ago
Zhongqing Robotics Launches T800 Humanoid Robots, Marking New Era of Mass Production
Read More
Zhongqing Robotics Launches T800 Humanoid Robots, Marking New Era of Mass Production
Zhongqing Robotics Launches T800 Humanoid Robots, Marking New Era of Mass Production
[SMM Flash News] According to reports, the Zhongqing Shenzhen Honghualing Intelligent Manufacturing Base has officially been put into operation, and the first batch of T800 humanoid robots successfully rolled off the production line, marking Zhongqing Robotics’ official entry into a new stage of large-scale delivery at the ten-thousand-unit level. This production site integrates intelligent manufacturing, R&D, and testing functions, boasts industry-leading production efficiency, and can achieve the production of one humanoid robot every 15 minutes. Its T800 humanoid robot stands 1.73 meters tall and weighs 75 kg, and adopts an integrated die-casting process using aerospace-grade high-strength aluminum alloy, balancing lightweight characteristics with overall structural stability.
17 hours ago
Jinhua Daya Auto Parts' Phase 2 Project Nears Completion, Set to Boost NEV Component Output
17 hours ago
Jinhua Daya Auto Parts' Phase 2 Project Nears Completion, Set to Boost NEV Component Output
Read More
Jinhua Daya Auto Parts' Phase 2 Project Nears Completion, Set to Boost NEV Component Output
Jinhua Daya Auto Parts' Phase 2 Project Nears Completion, Set to Boost NEV Component Output
[SMM Snapshot] According to reports, the second-phase construction project of Jinhua Daya Auto Parts Co., Ltd., with an annual output of 500,000 auto parts, in the NEV Town of Jinhua Development Zone, has recently entered the acceptance stage. Production lines for processes such as stamping and die-casting are being rapidly advanced and are about to start trial production. Daya Auto is a core supporting enterprise in the NEV industry chain, primarily supplying auto body and chassis metal sheet welding parts to automakers like Leap Motor. The company's first-phase factory has been smoothly put into operation, mainly providing the right front compartment longitudinal beam assembly for Leap Motor's Jinhua production site. The second-phase project adds perfected process systems including stam
17 hours ago
Shanghai Jingzhi Invests in Communication and Automotive Parts Project via Subsidiary
17 hours ago
Shanghai Jingzhi Invests in Communication and Automotive Parts Project via Subsidiary
Read More
Shanghai Jingzhi Invests in Communication and Automotive Parts Project via Subsidiary
Shanghai Jingzhi Invests in Communication and Automotive Parts Project via Subsidiary
[SMM Flash] According to reports, Shanghai Jingzhi Industrial Co., Ltd. recently announced that the company plans to invest through its wholly-owned subsidiary Anhui Jingzhi Intelligent Manufacturing Co., Ltd. in the construction of the “Communication Structural Parts and Precision Automotive Parts Production Project,” to further optimize the layout of its precision manufacturing capacity and build integrated delivery capabilities.
17 hours ago