Spot Transactions and Mine Bidding Are Active, With Continuous Increase in spot TCs

Publié: Jul 26, 2023 11:12
Source: SMM
As of last Friday (July 21), the SMM imported copper concentrate index (weekly) reported $93.05/mt, marking an increase of $0.31/mt compared to the previous index on July 14. According to SMM market research, the spot market transactions and mine bidding activities for copper concentrate have been quite active recently. The pricing coefficient for domestic trade mines with a grade of 20% is between 88.5% and 89.5%.

As of last Friday (July 21), the SMM imported copper concentrate index (weekly) reported $93.05/mt, marking an increase of $0.31/mt compared to the previous index on July 14. According to SMM market research, the spot market transactions and mine bidding activities for copper concentrate have been quite active recently. The pricing coefficient for domestic trade mines with a grade of 20% is between 88.5% and 89.5%.

Regarding mine bidding: In Chile, a certain mine concluded a tender for 40,000 mt of clean ore with a scheduled delivery period in September. Among them, 30,000 mt were transacted between smelters and the mine, with TC at a high level of above $88/mt. Additionally, 10,000 mt were transacted between traders and the mine, with a high-level TC at over $78/mt. Codelco conducted spot tenders for Andina and El Teniente copper mines, with a TC settlement between the mining companies and two trading firms at a low level of $81-82/mt, with scheduled delivery periods in August to October. The Carmen copper mine in the Philippines conducted a spot tender for 30,000 mt, with TC settlements between three trading firms and the mining company at a high level of over $78/mt.

In the spot market: In order to make up for the previous shortfall of 30,000 mt of copper concentrate due to arsenic exceeding the standard and being rejected by customs, a smelter in Central China has procured a portion of port spot goods from traders. The smelter purchased 10,000 mt of clean ore, scheduled for June shipment and arrival in mid-July, from traders at over $88/mt. They also purchased another 10,000 mt of clean ore, scheduled for June shipment and arrival in mid-July, from traders at a high TC price of over $88/mt. Finally, they procured 10,000 mt of oceanic clean ore, scheduled for August shipment, from traders at a low TC price of $91-92/mt. Recently, there have been transactions between traders and smelters for Las Bambas copper concentrate and other oceanic clean ores, with a settlement price ranging from $93-94/mt.

 

More popular news:

Shenzhen Released 24 Measures To Support High-Quality Development Of Foreign Trade

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

SMM Daily Comments (Jul 3): SHFE Base Metals Rose across the Board with Tin Surging, Ferrous Metals Prices Closed Mixed

SMM Daily Comments (Jul 5): Base and Ferrous Metals Prices Mostly Fell, WTI Soared despite Lingering Concerns over Global Economic Downturn

SMM Daily Comments (Jul 6): SHFE, LME Base Metals Diverged with SHFE Nickel and Tin Skyrocketing, Ferrous Metals Rose across the Board

China Commodity Supply and Demand Boomed in June

China Vows To Increase Macro-Control Efforts, Expand Consumption And Stabilise Investment

Citi Research Cautious about Copper Prices in Three Quarters, Iron Ore Prices to Have Support from Policy Stimulus

Copper Inventories in China Bonded Zones Plunged This Week

SAIC: Car Sales in June Rose to Highest for The Year


Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Actualités Connexes
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
il y a 1 minute
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Lire la suite
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
il y a 1 minute
Eldorado évalue une expansion de 43 % de l'usine à McIlvenna Bay alors que la mine approche de la production commerciale
il y a 4 minutes
Eldorado évalue une expansion de 43 % de l'usine à McIlvenna Bay alors que la mine approche de la production commerciale
Lire la suite
Eldorado évalue une expansion de 43 % de l'usine à McIlvenna Bay alors que la mine approche de la production commerciale
Eldorado évalue une expansion de 43 % de l'usine à McIlvenna Bay alors que la mine approche de la production commerciale
Eldorado Gold évalue une expansion de 43 % de la capacité de traitement de la mine de cuivre-zinc McIlvenna Bay en Saskatchewan, la faisant passer de 4 900 tpj à environ 7 000 tpj, parallèlement à un éventuel circuit argent-plomb. Plus de 400 000 tonnes de matériaux sont disponibles pour le traitement alors que l'exploitation progresse vers la production commerciale au troisième trimestre 2026. Le plan de faisabilité existant vise une production moyenne de cuivre sur la durée de vie de la mine d'environ 41 millions de livres (18,6 kt) par an.
il y a 4 minutes
One and One sécurise plus de 2 000 tonnes de matières premières pour sa nouvelle ligne de récupération des métaux aux Philippines
il y a 5 minutes
One and One sécurise plus de 2 000 tonnes de matières premières pour sa nouvelle ligne de récupération des métaux aux Philippines
Lire la suite
One and One sécurise plus de 2 000 tonnes de matières premières pour sa nouvelle ligne de récupération des métaux aux Philippines
One and One sécurise plus de 2 000 tonnes de matières premières pour sa nouvelle ligne de récupération des métaux aux Philippines
One and One Green Technologies a sécurisé plus de 2 000 tonnes de matières premières, notamment des boues cuprifères, nickélifères et électroniques, pour sa nouvelle ligne de récupération des métaux aux Philippines. L'installation des équipements est en cours et la production est prévue avant fin 2026. L'installation récupérera le cuivre, le nickel, l'or et l'argent à partir de déchets industriels et électroniques, ajoutant une nouvelle capacité locale de traitement pour des matières premières secondaires complexes contenant des métaux.
il y a 5 minutes
Spot Transactions and Mine Bidding Are Active, With Continuous Increase in spot TCs - Shanghai Metals Market (SMM)