Disruptions from Chile Floods on copper mine were Weaker than Expected

Publié: Jul 3, 2023 17:35
Source: SMM
Codelco's Andina Copper Mine (with output of 177,000 mt of copper content in 2022) resumed production after a brief outage caused by the floods in Chile. The key infrastructure equipment of the mine was not affected, though some roads in the mining area were washed away.

Codelco's Andina Copper Mine (with output of 177,000 mt of copper content in 2022) resumed production after a brief outage caused by the floods in Chile. The key infrastructure equipment of the mine was not affected, though some roads in the mining area were washed away.

The production of the El Teniente underground mine of Codelco (with an annual output of 405,000 mt of copper content in 2022) was not affected by the weather, but a technician died due to an electrical accident, which caused the mine to stop production and began to investigate the cause of the accident.

According to SMM survey, before the electrical accident at the El Teniente underground mine, the logistics efficiency had been reduced due to water accumulation on the surface of the mine and traffic restrictions on the road.

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Actualités Connexes
Copper prices consolidate under pressure as supply marginally loosens and demand stays weak [SMM Copper Morning Meeting Minutes]
il y a 3 minutes
Copper prices consolidate under pressure as supply marginally loosens and demand stays weak [SMM Copper Morning Meeting Minutes]
Lire la suite
Copper prices consolidate under pressure as supply marginally loosens and demand stays weak [SMM Copper Morning Meeting Minutes]
Copper prices consolidate under pressure as supply marginally loosens and demand stays weak [SMM Copper Morning Meeting Minutes]
SMM Morning Summary: Overnight, LME copper opened at $14,127/mt, dipped to a low of $14,102.5/mt in early trading, then its price center moved straight up to touch $14,292.5/mt, before drifting lower to close at $14,236.5/mt, up 0.31%. Trading volume reached 22,700 lots, and open interest stood at 268,600 lots, an increase of 3,229 lots from the previous trading day, driven by bullish positioning. Overnight, the most-traded SHFE copper 2610 contract opened at 108,500 yuan/mt, dipped to 108,310 yuan/mt in early trading, then its price center moved straight up to touch 108,760 yuan/mt, before drifting lower to close at 108,390 yuan/mt, up 0.26%. Trading volume reached 28,300 lots, and open interest stood at 206,000 lots, a decrease of 876 lots from the previous trading day, driven by bearish position reduction.
il y a 3 minutes
La situation au Moyen-Orient connaît des luttes d'influence répétées ; le cuivre au LME et au SHFE progresse légèrement lors de la séance de nuit [Commentaire matinal sur le cuivre de SMM]
il y a 12 minutes
La situation au Moyen-Orient connaît des luttes d'influence répétées ; le cuivre au LME et au SHFE progresse légèrement lors de la séance de nuit [Commentaire matinal sur le cuivre de SMM]
Lire la suite
La situation au Moyen-Orient connaît des luttes d'influence répétées ; le cuivre au LME et au SHFE progresse légèrement lors de la séance de nuit [Commentaire matinal sur le cuivre de SMM]
La situation au Moyen-Orient connaît des luttes d'influence répétées ; le cuivre au LME et au SHFE progresse légèrement lors de la séance de nuit [Commentaire matinal sur le cuivre de SMM]
il y a 12 minutes
ACG : l'expansion du projet de sulfures de Gediktepe produit ses premiers concentrés de cuivre et de zinc ; la pleine production visée d'ici fin 2026
il y a 14 heures
ACG : l'expansion du projet de sulfures de Gediktepe produit ses premiers concentrés de cuivre et de zinc ; la pleine production visée d'ici fin 2026
Lire la suite
ACG : l'expansion du projet de sulfures de Gediktepe produit ses premiers concentrés de cuivre et de zinc ; la pleine production visée d'ici fin 2026
ACG : l'expansion du projet de sulfures de Gediktepe produit ses premiers concentrés de cuivre et de zinc ; la pleine production visée d'ici fin 2026
ACG Metals a annoncé le 1er septembre que sa mine de Gediktepe en Turquie a produit son premier concentré de cuivre le 31 août, marquant le début de la phase de montée en puissance. L'entreprise augmentera progressivement le débit et optimisera les performances de l'usine, avec un objectif de pleine production d'ici fin 2026. L'objectif de production annuelle en régime de croisière de Gediktepe est de 20 000 à 25 000 tonnes d'équivalent cuivre. L'annonce complète a également confirmé que la mine a produit son premier concentré de zinc en août 2026, bien que la date précise et les volumes n'aient pas été divulgués. SMM estime la production de zinc contenu dans le concentré de la mine à environ 10 000 à 15 000 tonnes en 2026.
il y a 14 heures
Disruptions from Chile Floods on copper mine were Weaker than Expected - Shanghai Metals Market (SMM)