Tangshan due to the epidemic to re-control the supply and demand storm and iron ore prices can ripple? [SMM analysis]

Publié: Apr 18, 2022 18:25 (GMT+8)
Source: SMM
SMM analysis: can iron ore prices ripple once again due to the epidemic in Tangshan to control the supply and demand storm? The iron ore market continued to fluctuate today, rising more than 1% after a smooth red in early trading, then fell back to close by 0.88% to 922 yuan / ton. On the news side, affected by the epidemic situation in the surrounding areas, since 00:00 on April 18, Qian'an, Qianxi, Luanchuan and Guzhi District of Tangshan City have once again implemented recovery control. SMM believes that the impact of the Tangshan closure on iron ore is limited. At present, many steel mills in Tangshan have applied for permits to ensure the normal transportation and supply of iron ore.

SMM4 March 18: today's iron ore market continues to fluctuate, after a smooth red in early trading, rose more than 1% at one point, and then fell back to close, up 0.88% at 922 yuan / ton.

"Click to view the real-time market of iron ore futures.

The price in the port spot market was stable in early trading compared with last Friday. Some traders are active in shipping; steel mills are more cautious and wait-and-see today, and their purchasing enthusiasm is not high. The overall transaction atmosphere in the market is deserted. Overall transaction prices rose steadily.

On the face of the news

Affected by the epidemic situation in the surrounding areas, since 00:00 on April 18, Qian'an, Qianxi, Luanchuan and Guzhi District in Tangshan City have been cured again, with further notice of the contact time.

Last week, the Central Commission for discipline Inspection said it would strengthen supervision and law enforcement in response to the sharp rise in prices such as iron ore and thermal coal.

Fundamentals:

On the supply side, due to seasonal factors in the southern hemisphere in the first quarter, overseas shipments were generally low, Australian and Brazilian shipments recovered slowly, and iron ore port inventories are expected to enter a continuous downward channel. At present, the amount of iron ore arriving at the port remains low, and the supply is in a period of tension. In addition, domestic and foreign iron ore prices hang upside down, domestic steel mills prefer to purchase port spot, so in the short term, the port will enter the rapid depot stage, giving certain support to mineral prices.

From the demand side, the epidemic situation in Binzhou, Shandong, Tangshan, Hebei, and Anshan, Liaoning, and other places has improved, and the shortage of raw materials has slightly improved. The production of steel mills has recovered slowly, and the output of hot metal has increased, driving the demand for iron ore. However, taking into account the backlog of steel mills inventory, superimposed profits and losses, squeeze iron ore prices.

Blast furnace operating rate, as of April 15, SMM statistics of the blast furnace operating rate of 82.39%, cycle-to-cycle increase of 0.44%, month-on-month increase of 0.82%.

The operating rate of the blast furnace in this period is slightly higher than that of last week, mainly due to the resumption of production of some blast furnaces stopped due to the epidemic, and the resumption of production this week after the completion of maintenance of individual blast furnaces. According to SMM research, at present, the epidemic situation is spreading in China, and the influence degree of the epidemic situation is different in different places. A total of 28 blast furnaces have been shut down one after another by the epidemic, of which 15 have resumed production and the average daily output of hot metal has been restored to 57000 tons. 13 are still in a state of suspension, with an average daily impact of 52500 tons of hot metal.

To sum up, SMM believes that the impact of the Tangshan closure on iron ore is limited. At present, many steel mills in Tangshan have applied for permits to ensure the normal transportation and supply of iron ore, and the demand for iron ore is stable in the short term. Considering that the profits of steel mills are already at a loss and the coke has been raised in the sixth round, once the profits of steel mills hit the ground will shrink again, there is a risk of production reduction. And cut reserve requirements, interest rates are expected to land in the near future, real estate and other downstream industry demand is expected to improve, good steel prices. It is expected that iron ore prices will fluctuate mainly in the short term.

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Actualités Connexes
Le projet pilote BHP-Amazon sur le cuivre EAC suscite l'intérêt du secteur minier pour l'étiquetage bas carbone
il y a 8 heures
Le projet pilote BHP-Amazon sur le cuivre EAC suscite l'intérêt du secteur minier pour l'étiquetage bas carbone
Lire la suite
Le projet pilote BHP-Amazon sur le cuivre EAC suscite l'intérêt du secteur minier pour l'étiquetage bas carbone
Le projet pilote BHP-Amazon sur le cuivre EAC suscite l'intérêt du secteur minier pour l'étiquetage bas carbone
Les médias miniers hispanophones rapportent que BHP et Amazon ont lancé le premier projet pilote de cuivre à faibles émissions à Escondida, utilisant des certificats d'attributs environnementaux qui certifient les réductions d'émissions au sein même du site minier plutôt que de les compenser ailleurs. Dévoilé le 22 septembre 2026, ce projet pilote s'appuie sur l'électricité renouvelable et l'eau dessalée d'Escondida, Amazon retirant les certificats afin d'associer des attributs bas carbone à son infrastructure d'IA. Escondida produit environ 1,2 million de tonnes de cuivre par an, ce qui en fait la plus grande mine au monde, et ce label devrait répondre à la demande croissante d'approvisionnement en métal bas carbone.
il y a 8 heures
La filiale de Western Mining obtient une licence de 17 ans pour la mine polymétallique du Qinghai
22 Sep 2026 16:11 (GMT+8)
La filiale de Western Mining obtient une licence de 17 ans pour la mine polymétallique du Qinghai
Lire la suite
La filiale de Western Mining obtient une licence de 17 ans pour la mine polymétallique du Qinghai
La filiale de Western Mining obtient une licence de 17 ans pour la mine polymétallique du Qinghai
Le 22 septembre, Western Mining a annoncé que sa filiale à 100 %, Qinghai Ganxin Mining Development Co., Ltd. (« Ganxin Mining »), avait récemment obtenu un permis minier délivré par le Département des ressources naturelles de la province du Qinghai. La mine, dénommée mine polymétallique de fer de Geermu Tuwenchahan de Qinghai Ganxin Mining Development Co., Ltd., couvre le fer, le cuivre, l'or, le molybdène, le zinc, le plomb et l'argent comme substances minières autorisées. Le permis minier est valable du 3 août 2026 au 30 août 2043.
22 Sep 2026 16:11 (GMT+8)
Le projet américain de 7,4 milliards de dollars de Korea Zinc passe l'évaluation environnementale et devrait entrer en phase d'essai en 2029
21 Sep 2026 17:02 (GMT+8)
Le projet américain de 7,4 milliards de dollars de Korea Zinc passe l'évaluation environnementale et devrait entrer en phase d'essai en 2029
Lire la suite
Le projet américain de 7,4 milliards de dollars de Korea Zinc passe l'évaluation environnementale et devrait entrer en phase d'essai en 2029
Le projet américain de 7,4 milliards de dollars de Korea Zinc passe l'évaluation environnementale et devrait entrer en phase d'essai en 2029
Le 21 septembre, Korea Zinc a annoncé que son projet manufacturier américain de 7,4 milliards de dollars avait passé l'évaluation d'impact environnemental. L'installation devrait commencer ses opérations d'essai en 2029 et la production commerciale l'année suivante, produisant 11 minéraux critiques, 12 métaux non ferreux et de l'acide sulfurique de qualité semi-conducteur. En avril, Korea Zinc a déclaré avoir finalisé l'acquisition d'une fonderie de zinc locale et d'autres sociétés liées. L'entreprise prévoit de mettre en œuvre le projet en agrandissant et en modernisant les installations existantes.
21 Sep 2026 17:02 (GMT+8)