SMM4, March 3: Rio Tinto issued a statement of force majeure on Friday, saying it was unable to supply copper to customers.
Mining giant Rio Tinto suspended operations at the Kennecott copper, gold and silver mine and shut down its smelter after a 5.7-magnitude earthquake struck Utah on March 18, and the company is restarting its smelter.
The Kennecott mine, which employs about 2000 people, produced 51400 tons of refined copper in the fourth quarter of 2019 and 184600 tons of refined copper throughout 2019.
"Click to participate in the second China (Yingtan) Copper Industry Summit and the 15th China International Copper Industry chain Summit."

To sign up for the summit or apply to enter the SMM industry exchange group, please scan the code:

![L'offre restreinte, conjuguée à une réticence croissante à vendre, a maintenu les prix du cuivre secondaire à des niveaux élevés [Revue hebdomadaire SMM des matières premières de cuivre secondaire hors de Chine]](https://imgqn.smm.cn/usercenter/HhNHP20251217171708.jpg)
![[Mingyi Electronics lance un équipement d'électrodéposition en ligne à portique à rapport d'aspect élevé pour serveurs IA et substrats de circuits intégrés]](https://imgqn.smm.cn/usercenter/CaDcj20251217171711.jpg)
![L'inflation américaine dépasse les attentes, combinée à l'accumulation de stocks en Chine, les prix du cuivre rebondissent sous pression [Revue macroéconomique hebdomadaire SMM]](https://imgqn.smm.cn/usercenter/JnFuh20251217171711.jpg)
