Tender Announcement for Externally Purchased Metallurgical Coke by Chaoyang Steel in May 2026

Published: Apr 28, 2026 14:50

1 Procurement Conditions

The purchaser of this procurement project, Externally Purchased Metallurgical Coke for Chaoyang Steel in May 2026 (AGCYGTHHD260427284439), is the Management Center of Ansteel Group Chaoyang Steel Co., Ltd. The project funds are self-raised. The project has met the procurement conditions, and an open single-round negotiation is now being conducted.

2 Project Overview and Procurement Scope

2.1 Project Name: Externally Purchased Metallurgical Coke for Chaoyang Steel in May 2026

2.2 Procurement failure to be converted to other procurement methods: converted to direct procurement

2.3 The procurement content, scope, and scale of this project are detailed in the attachment "Material List Attachment.pdf".

3 Bidder Qualification Requirements

3.1 Joint venture bidding is not allowed for this procurement.

3.2 Bidders for this procurement shall meet the following qualification requirements:

See attachments (if applicable)

3.3 Bidders for this procurement shall meet the following registered capital requirements:

Production-type registered capital: 20 million yuan and above

Distribution-type registered capital: 20 million yuan and above

3.4 Bidders for this procurement shall meet the following performance requirements:

See attachments.

3.5 Bidders for this procurement shall meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: See attachments.

Capability requirements: See attachments.

Other requirements: See attachments.

3.6 For projects that are required by law to undergo tendering in this procurement, bids from persons subject to enforcement for breach of trust shall be invalid.

4 Obtaining Procurement Documents

4.1 All parties interested in bidding shall log in to the Ansteel Smart Tender and Bid Platform at http://bid.ansteel.cn to download the electronic procurement documents from 12:00 on April 27, 2026 to 08:00 on April 30, 2026 (Beijing time, the same hereinafter).

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
EAST's Malaysia Diesel-PV+ESS Project Successfully Launched, Marking Milestone in SE Asia
52 mins ago
EAST's Malaysia Diesel-PV+ESS Project Successfully Launched, Marking Milestone in SE Asia
Read More
EAST's Malaysia Diesel-PV+ESS Project Successfully Launched, Marking Milestone in SE Asia
EAST's Malaysia Diesel-PV+ESS Project Successfully Launched, Marking Milestone in SE Asia
Recently, EAST's official account announced that its 520kW/2088kWh diesel-PV+ESS project, developed in partnership with a Malaysian company, was successfully delivered and officially put into operation! This is another landmark on-grid/off-grid energy storage project for EAST in the Southeast Asian region, providing stable, efficient, and low-carbon integrated energy solutions to the local area with cutting-edge technology. Equipment On-site Diagram The successful commissioning of the Malaysia diesel-PV+ESS project marked an important step in EAST's global expansion and a vivid demonstration of EAST's technological strength going international.
52 mins ago
Groundbreaking Ceremony Held for Largest, Most Advanced Energy Storage Project in Shanxi Zone
53 mins ago
Groundbreaking Ceremony Held for Largest, Most Advanced Energy Storage Project in Shanxi Zone
Read More
Groundbreaking Ceremony Held for Largest, Most Advanced Energy Storage Project in Shanxi Zone
Groundbreaking Ceremony Held for Largest, Most Advanced Energy Storage Project in Shanxi Zone
On April 22, the Huajing Heshun 400,000 kW/800,000 kWh energy storage project in Shanxi Transformation and Comprehensive Reform Demonstration Zone held its groundbreaking ceremony at Xiaohe Emerging Industry Park. The Huajing Heshun 400,000 kW/800,000 kWh energy storage project is currently the largest, most technologically advanced, and most fully functional energy storage rod project in the zone. The project adopts advanced ESS technology from China, integrating power grid support, frequency regulation and peak shaving, new energy accommodation, and emergency supply guarantee. Once completed, it will significantly enhance the safe and stable operation of the regional power grid, and is of great significance for strengthening power grid regulation capacity, improving new energy accommodation levels, reducing resource utilization costs, and promoting the optimization of regional energy structures.
53 mins ago
Sanhui Energy's Wenshui County Hybrid Energy Storage Project Achieves Full Grid Connection
54 mins ago
Sanhui Energy's Wenshui County Hybrid Energy Storage Project Achieves Full Grid Connection
Read More
Sanhui Energy's Wenshui County Hybrid Energy Storage Project Achieves Full Grid Connection
Sanhui Energy's Wenshui County Hybrid Energy Storage Project Achieves Full Grid Connection
Recently, Sanhui Energy's official account announced that the Wenshui County 200MW/100.83MWh independent hybrid energy storage project, in which it was deeply involved in construction, achieved full-capacity grid connection. The project is located in Wenshui County, Lvliang City, Shanxi Province, adopting a hybrid technology route of "flywheel energy storage + LFP battery energy storage." The station area is divided into four functional zones: office and living service facilities, power distribution and step-up substation, LFP energy storage, and flywheel energy storage. A total of 400 flywheel energy storage units with a single-unit capacity of 125KW were built, along with 13 units of 3.44MW and 2 units of 2.64MW LFP battery cabins. The supporting electrical systems, control systems, and civil engineering works were completed simultaneously.
54 mins ago