POSCO Future M Signs $675M Graphite Anode Supply Deal with Global Automaker Till 2032

Published: Mar 16, 2026 12:00
POSCO Future M, the battery materials unit of South Korea's POSCO Holdings, announced that it had signed a supply agreement for artificial graphite anode material used in lithium-ion batteries. The contract is worth KRW 1,014,945,300,000 (approximately $675 million). The counterparty is a global automaker, and the contract term runs from October 1, 2027 to September 30, 2032.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
PetroChina's First Green Electricity Direct Connection Project Approved in Tarim
30 mins ago
PetroChina's First Green Electricity Direct Connection Project Approved in Tarim
Read More
PetroChina's First Green Electricity Direct Connection Project Approved in Tarim
PetroChina's First Green Electricity Direct Connection Project Approved in Tarim
On March 12, PetroChina’s Tarim Oilfield “Aksu, Shaya County, Fuman Block PV Green Electricity Direct Connection Project” officially received approval from the Xinjiang Uygur Autonomous Region National Development and Reform Commission, making it PetroChina’s first approved green electricity direct connection project. Located in the Taklamakan Desert south of Shaya County, Aksu Prefecture, Xinjiang, the project is a comprehensive green energy project integrating generation-grid-load-storage. According to the plan, the green electricity direct connection project will build a PV power station with a total installed capacity of 100,000 kW as the source of green power. To ensure stable power supply and reduce the curtailment of PV power generation, an additional 20 MW/80 MWh ESS power station will be added to serve as a super “power bank,” effectively smoothing PV fluctuations and ensuring continuous power supply to the load. Connecting the power supply and the power consumption side will be a planned 2.5-km direct power transmission line and a 110-kV substation.
30 mins ago
[SMM New Energy] Over 1B Yuan Invested: 2GWh Special-Purpose Solid-State Battery R&D and Production Project Commences
41 mins ago
[SMM New Energy] Over 1B Yuan Invested: 2GWh Special-Purpose Solid-State Battery R&D and Production Project Commences
Read More
[SMM New Energy] Over 1B Yuan Invested: 2GWh Special-Purpose Solid-State Battery R&D and Production Project Commences
[SMM New Energy] Over 1B Yuan Invested: 2GWh Special-Purpose Solid-State Battery R&D and Production Project Commences
Dali Era Energy Co., Ltd. has officially broken ground on its Wide-Temperature High-Rate Advanced Special-Purpose Lithium Battery R&D and Production Base in the Dali Economic and Technological Development Zone, Yunnan. With a total investment exceeding 1 billion yuan, the project covers 80 acres and has an 8-month construction timeline. Once operational, it will reach an annual capacity of 2GWh, targeting an annual revenue of 1.5 billion yuan and creating over 300 jobs. This facility focuses on advanced solid-state and special-purpose battery technologies designed for extreme environmental performance.
41 mins ago
[Phosphorus Chemical Industry: Wengfu's Wet-Process 85 Phosphoric Acid Rose by 700 yuan Within Half a Month, and Iron Phosphate Production Costs Came Under Upward Pressure]
41 mins ago
[Phosphorus Chemical Industry: Wengfu's Wet-Process 85 Phosphoric Acid Rose by 700 yuan Within Half a Month, and Iron Phosphate Production Costs Came Under Upward Pressure]
Read More
[Phosphorus Chemical Industry: Wengfu's Wet-Process 85 Phosphoric Acid Rose by 700 yuan Within Half a Month, and Iron Phosphate Production Costs Came Under Upward Pressure]
[Phosphorus Chemical Industry: Wengfu's Wet-Process 85 Phosphoric Acid Rose by 700 yuan Within Half a Month, and Iron Phosphate Production Costs Came Under Upward Pressure]
[Phosphorus Chemical Industry: Wengfu's Wet-Process 85 Phosphoric Acid Rose by 700 yuan/mt Within Half a Month, Pushing Iron Phosphate Production Costs Higher Under Pressure] On March 16, 2026, SMM reported that phosphorus giant Wengfu Group raised the ex-factory price of wet-process 85 phosphoric acid by 200 yuan/mt yesterday. Wengfu implemented a "price adjustment on every 5th" mechanism (the 5th, 15th, and 25th of each month). This marked the second price adjustment in March, bringing the cumulative increase to 700 yuan/mt (it had already increased by 500 yuan/mt on March 5). The continued increases in phosphoric acid prices brought significant cost pressure to new energy enterprises, while the production costs of iron phosphate via the iron-process and sodium-process routes rose by several hundred yuan accordingly.
41 mins ago