First Quantum Minerals Approves $20M Monthly Maintenance Plan for Idle Cobre Panama Mine

Published: Jun 4, 2025 19:42
According to SMM, under a recently approved maintenance plan, First Quantum Minerals will spend approximately US$20 million per month to maintain its idle Cobre Panama copper mine. Roderick Gutierrez, President of the Panamanian Chamber of Mines, stated that the costs would be covered by selling copper concentrates stored at the mine site. The company currently holds 121,000 mt of concentrates, although some have deteriorated after nearly two years of idleness. In an interview with local media, Gutierrez pointed out that reprocessing these degraded materials may not be economically feasible. The mine's maintenance plan incorporates the latest environmental and legal regulations and is expected to take six to twelve months to implement, with the exact timeline depending on the condition of the equipment. Supervision will be the responsibility of ten government departments, including the Ministry of Environment of Panama.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Copper Prices Surge, Inventory Levels Shift as Producers Slow Output and Downstream Demand Wavers
42 mins ago
Copper Prices Surge, Inventory Levels Shift as Producers Slow Output and Downstream Demand Wavers
Read More
Copper Prices Surge, Inventory Levels Shift as Producers Slow Output and Downstream Demand Wavers
Copper Prices Surge, Inventory Levels Shift as Producers Slow Output and Downstream Demand Wavers
【SMM Copper Cathode Rod News Flash】Inventory side, raw material inventory side, enterprises purchased as needed and inventory edged down WoW; finished product inventories, under high copper prices, downstream wait-and-see sentiment intensified and cargo pick-up slowed down, finished product inventories increased WoW. SMM expected enterprises to slow down production and prioritize destocking, with operating rate pulling back 2.66 percentage points WoW to 60.84%.
42 mins ago
Copper Cathode Rod Producers' Operating Rate Rises Despite Weak Demand and High Prices
45 mins ago
Copper Cathode Rod Producers' Operating Rate Rises Despite Weak Demand and High Prices
Read More
Copper Cathode Rod Producers' Operating Rate Rises Despite Weak Demand and High Prices
Copper Cathode Rod Producers' Operating Rate Rises Despite Weak Demand and High Prices
【SMM Copper Cathode Rod News Flash】The operating rate of copper cathode rod producers rebounded 2.93 percentage points WoW to 63.51% this week. Although production gradually recovered after the holiday, persistently rising copper prices dampened downstream purchasing sentiment. New orders for cables and enamelled wire remained weak, and overall end-user demand was sluggish, dragging operating rates below expectations.
45 mins ago
US Dollar Index Strengthened, Copper Prices Remained Under Pressure [SMM BC Copper Commentary]
57 mins ago
US Dollar Index Strengthened, Copper Prices Remained Under Pressure [SMM BC Copper Commentary]
Read More
US Dollar Index Strengthened, Copper Prices Remained Under Pressure [SMM BC Copper Commentary]
US Dollar Index Strengthened, Copper Prices Remained Under Pressure [SMM BC Copper Commentary]
57 mins ago