[125MW/250MWh! Wolong Electric Drives Plans to Invest 2.03 Billion Yuan in a New Energy Plus Energy Storage Grid-Connected Pilot Demonstration Project]
SMM has learned that on the evening of December 24, Wolong Electric Drives announced that the company plans to invest in the construction of the Baotou Damaoqi New Energy Plus Energy Storage Grid-Connected Pilot Demonstration Project through its subsidiary, Shunfeng New Energy (Damaoqi) Co., Ltd. The total installed capacity of the project is 500MW, with a total investment of 2.03 billion yuan. The project has been approved by the Baotou Development and Reform Commission. According to the announcement, the Baotou Damaoqi New Energy Plus Energy Storage Grid-Connected Pilot Demonstration Project has significant economic and social benefits. The company's proposed investment in this project aligns with the national "dual carbon" policy and the company's "123 Development Strategy," which will further promote the development of the company's new energy business, enhance its overall competitiveness, and improve its overall profitability.
![[SMM Revisión semanal del mercado de celdas de baterías de almacenamiento de energía 9.3] La escasez de láminas de cobre limita los programas de producción de septiembre, los precios de las celdas de baterías de almacenamiento de energía se mantienen firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

