Iron Ore Futures Fluctuate but Close Higher, Boosted by Strong Demand Amid Production Rebound

Publicado: Oct 11, 2024 16:32
Today, iron ore futures first weakened before strengthening, with a volatile trading day throughout. The main contract I2501 finally closed at 789, up 1.15% for the day. Traders actively shipped out goods, while steel mills made purchases in small volumes and multiple times as needed. The trading atmosphere in the market today was fairly good. Transaction prices were around 775-785 yuan/ton, up 10-15 yuan/ton from yesterday; with the recent rebound in molten iron production, iron ore demand still has room for growth, supporting the ore price. Attention should be paid to whether there will be any significant policies introduced at the important meeting tomorrow and whether the growth in terminal demand can be sustained. .........

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
hace 1 minuto
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Leer más
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Indian integrated logistics and engineering services company Sical Logistics has secured a five-year mining contract worth approximately ₹5.3473 billion from Central Coalfields Limited for heavy earth-moving and mining operations at the SDOC Mine in Bokaro district, Jharkhand. The contract covers the re-handling of approximately 20.14 million cubic metres of overburden, the removal of around 33.65 million cubic metres of hard overburden, and the extraction of approximately 9.104 million tonnes of coal from a 143-hectare working area. The contract value includes an 18% goods and services tax, while the execution period is 1,825 days. A simple five-year average would place the contracted coal volume at approximately 1.82 million tonnes per year.
hace 1 minuto
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
hace 1 minuto
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Leer más
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Eastern Coalfields Limited (ECL) said on August 31 that it had begun precautionary sealing measures at Khandra Colliery in the Raniganj coal belt. Surface cracks and ground subsidence were first observed near the Nikanth Temple on July 28. ECL said unauthorised structures and illegal occupants in the affected area had restricted surface-filling work. As the cracks could not be properly filled, external air could enter the underground workings, aggravate the spontaneous heating of residual coal and further increase the risk of spontaneous combustion. ECL therefore initiated the sealing measures to protect employees and surrounding areas and will continue monitoring conditions at the site. Existing employees will be redeployed to other units of the same mine or neighbouring mines according to operational requirements. The sealing measures will not disrupt existing water or electricity supplies to residential quarters. ECL has not determined how long the sealing will remain in place and rejected reports suggesting that the colliery could be sealed for three months. The final duration will be determined based on expert advice, technical assessments and established mine-safety requirements.
hace 1 minuto
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
hace 1 minuto
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Leer más
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Extreme drought has lowered river levels in East Kalimantan, disrupting transportation operations for some coal producers. Data from Indonesia’s meteorological agency showed that East Kalimantan received almost no rainfall in August. To prevent barges from running aground, local producers have been forced to reduce their coal loads. A local port official said that barges normally capable of carrying 7,000 tonnes of coal are currently limited to approximately 5,500 tonnes, representing a reduction of 1,500 tonnes, or about 21.4%, per trip. Some barges continue to face difficulties travelling upstream despite carrying reduced loads. The industry group noted that the decline in carrying capacity per trip will require more voyages and raise logistics costs.
hace 1 minuto
Today, iron ore futures first weakened before strengthening, with a vo - Shanghai Metals Market (SMM)