[0.63 yuan/Wh! The bidding for the 117MW/234MWh energy storage PC project of China Resources Caofeidian photovoltaic power generation project has been opened] SMM has learned that on July 24th, the bidding candidate announcement for the general contracting project of the 117MW/234MWh supporting energy storage PC project of the green and low-carbon energy photovoltaic power generation project (Phase I) of China Resources Caofeidian Petrochemical Industrial Base was released.
The details of the bidding candidates are as follows: The first bidding candidate is Beijing Hyperstar Technology Co., Ltd., with a bidding price of 147,449,456.52 yuan, equivalent to a unit price of 0.63 yuan/Wh; the second bidding candidate is CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., with a bidding price of 149,760,900 yuan, equivalent to a unit price of 0.64 yuan/Wh.
![[SMM Revisión semanal del mercado de celdas de baterías de almacenamiento de energía 9.3] La escasez de láminas de cobre limita los programas de producción de septiembre, los precios de las celdas de baterías de almacenamiento de energía se mantienen firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

