Fulongma Approved for New Energy Lithium Battery Development Project with Annual Capacity of 2010 Tons

Publicado: Jun 12, 2024 09:45
Recently, Fulongma New Energy Technology Development Co., Ltd. was approved to carry out a project for the development and utilization of new energy lithium batteries. This project covers an area of 7732.2 square meters with a total investment of 50 million yuan. The construction will include production workshops and supporting facilities, including battery pack and module disassembly lines, crushing and disassembly lines. The main facilities cover the temporary battery storage area, temporary disassembly material storage area, finished product warehouse, equipment trial production test area, battery pack and module disassembly line, crushing and disassembly line and waste gas treatment area. After completion, the project will recycle 2010 tons of battery cells annually, produce 2846.142 tons of battery powder, and produce 400 tons of copper particles and 160 tons of aluminum particles as by-products.

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Recently, Fulongma New Energy Technology Development Co., Ltd. was app - Shanghai Metals Market (SMM)