[100,000-ton Lithium Electric Material Project Signed in Sichuan] Recently, the 2024 Investment Attraction Conference and Project Signing Ceremony of Shehong City, Sichuan Province, was held, and the Shehong Municipal People's Government signed a contract with Fulin New Energy for the cathode material precursor project at the conference.
The project is expected to have a total investment of 520 million yuan, with a fixed asset investment plan of 200 million yuan. After completion and production, the project will greatly solve the cost control and raw material supply issues of the group's existing cathode material projects. This is the third project signed and implemented by Fulin Group in Shehong.

![[SMM Revisión semanal del mercado de celdas de baterías de almacenamiento de energía 9.3] La escasez de láminas de cobre limita los programas de producción de septiembre, los precios de las celdas de baterías de almacenamiento de energía se mantienen firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)
