Polysilicon production continued to rise, and domestic EVA photovoltaic material prices continued to decline

Publicado: Apr 30, 2024 15:55
Fuente: SMM
Yesterday, the mainstream prices of polysilicon N-type materials and dense polysilicon were 43-49 yuan/kg and 39-44 yuan/kg respectively.

Polysilicon
Yesterday, the mainstream prices of polysilicon N-type materials and dense polysilicon were 43-49 yuan/kg and 39-44 yuan/kg respectively. The price of polysilicon continued to fall yesterday, and the market sentiment was poor. Every company has cost pressure, and the upstream continued to push pressure.
Output: Polysilicon companies are operating normally in April, and with new production capacity coming into operation, output continues to rise. However, one small factory is undergoing maintenance, and there is a possibility of expansion due to inventory and cost pressures.
Inventory: Downstream purchases are active, operating rate is high, and inventory is still around 200,000 tons.
Solar cell
Price: Battery prices are still expected to fall. The current price of high-efficiency PERC182 cells (efficiency of 23.2% and above) is 0.34-0.35 yuan/W; the price of PERC210 cells is around 0.35-0.38 yuan/W; the price of Topcon182 cells (efficiency of 24.4% and above) is around 0.38-0.39 yuan/W; and the price of Topcon210 cells is 0.40-0.41 yuan/W.
Production: Topcon battery production in May is expected to increase compared to April, while P-type battery production will decrease.
Inventory: Current battery inventories continue to grow, and demand is weak. Integrated manufacturers had sufficient battery stocks in March and April, so although component production schedules increased in May, the impact on battery demand was limited.
PV film
Price
EVA photovoltaic material: The current transaction price of domestic EVA photovoltaic material continues to decline, and there is a significant difference in the decline range and price range; EVA wire and cable material continues to decline, the price dropped significantly, and there is a significant difference in the adjustment range and price range. Affected by the large price difference, it is impossible to give a guiding standard today. For details, please consult the analyst (Zhang, 18919136634). EVA foaming prices remained at 10,800-11,000 yuan/mt. POE photovoltaic material C4 remained at $2550-2650/mt, and C8 remained at $2650-2750/mt.
Photovoltaic film: The current mainstream film price is 6.93-7.06 yuan/square meter for 420g transparent EVA film, 7.35-7.94 yuan/square meter for 420g white EVA film, 7.90-8.06 yuan/square meter for 380g EPE film, and 10.26-10.45 yuan/square meter for 380g POE film. The price of EVA film may be officially adjusted.
Output: This week, upstream particle companies operated normally, and actual output in April dropped significantly. Compared with the expectations at the beginning of the month, it has now been reduced to less than 100,000 tons.
Mainstream manufacturers have completed maintenance and resumed production. Film production is normal. The first quarter financial report has been released. Please consult analysts for details.
Inventory: The current inventory of upstream enterprises needs to be judged according to different enterprises, and the inventory is limited. The film is produced according to demand.
Inverter
Price: The price range for 20kw inverter is 0.15-0.19 yuan/W, 0.14-0.18 yuan/W for 50kw, 0.12-0.17 yuan/W for 110 kw.
Supply and demand: There is no change in the inverter price range and the price remains stable. The inverter supply is full and the production of high-power inverters has been increased. The shipment is stable, with high growth rates in domestic household demand and overseas demand in regions such as India, Pakistan and Brazil. Shipments in Europe are affected by inventory.

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
Tasas operativas de marcos fotovoltaicos estables, expectativas debilitándose; el desabastecimiento de lingotes de aluminio se acelera y el centro del precio del aluminio sube [Análisis de SMM]
hace 11 horas
Tasas operativas de marcos fotovoltaicos estables, expectativas debilitándose; el desabastecimiento de lingotes de aluminio se acelera y el centro del precio del aluminio sube [Análisis de SMM]
Leer más
Tasas operativas de marcos fotovoltaicos estables, expectativas debilitándose; el desabastecimiento de lingotes de aluminio se acelera y el centro del precio del aluminio sube [Análisis de SMM]
Tasas operativas de marcos fotovoltaicos estables, expectativas debilitándose; el desabastecimiento de lingotes de aluminio se acelera y el centro del precio del aluminio sube [Análisis de SMM]
hace 11 horas
[SMM PV Flash]
hace 13 horas
[SMM PV Flash]
Leer más
[SMM PV Flash]
[SMM PV Flash]
Una importante planta petroquímica detuvo ayer una línea de reanudación de producción y hoy otra línea comenzó a producir LDPE. A corto plazo, el programa de producción de la empresa mantendrá la producción paralela de una línea de material de alta presión y una línea de material fotovoltaico. Tras este ajuste de líneas, la escala de producción de material fotovoltaico de la planta se ha reducido en cierta medida.
hace 13 horas
[SMM Noticias FV] El proyecto fotovoltaico Huaneng Shaanxi Shenmu de 100 MW logra la conexión a red a plena capacidad
hace 13 horas
[SMM Noticias FV] El proyecto fotovoltaico Huaneng Shaanxi Shenmu de 100 MW logra la conexión a red a plena capacidad
Leer más
[SMM Noticias FV] El proyecto fotovoltaico Huaneng Shaanxi Shenmu de 100 MW logra la conexión a red a plena capacidad
[SMM Noticias FV] El proyecto fotovoltaico Huaneng Shaanxi Shenmu de 100 MW logra la conexión a red a plena capacidad
El 31 de agosto de 2026, el proyecto de generación de energía fotovoltaica de 100.000 kW de Huaneng Shaanxi Shenmu logró la conexión a la red a plena capacidad, lo que marca que la capacidad instalada de la Filial de Nuevas Energías de Huaneng Shaanxi superó los 3 millones de kW. Desde el inicio del proyecto Shenmu, frente a múltiples desafíos como el frecuente viento y arena en el norte de Shaanxi, terrenos y relieves complejos, condiciones de construcción limitadas y plazos ajustados, todos los constructores unieron esfuerzos, superaron dificultades y buscaron la excelencia. Aplicaron estrictamente los requisitos de seguridad en la producción y control de calidad, coordinaron científicamente los planes de construcción, optimizaron los flujos de los procesos constructivos y avanzaron de manera ordenada en tareas clave como la construcción de la estación elevadora, la instalación de soportes para paneles solares, el tendido de módulos, la instalación de líneas colectoras y la depuración y calibración de equipos. Mediante una gestión refinada, una construcción estandarizada y la resolución sistemática de problemas, resolvieron con eficiencia diversas dificultades y cuellos de botella durante el proceso constructivo, impulsaron de forma constante el avance del proyecto y completaron con éxito la conclusión perfecta desde la primera conexión a la red hasta la conexión a plena capacidad, demostrando plenamente la velocidad, la responsabilidad y la calidad de Huaneng.
hace 13 horas
Polysilicon production continued to rise, and domestic EVA photovoltaic material prices continued to decline - Shanghai Metals Market (SMM)