On April 9th, Hangzhou Yu Zhenggong started the construction of the energy storage battery management system intelligent manufacturing center project on plot number 26 in 【2023】.
The project is located in the Qianjiang Economic Development Zone of Hangzhou, with a total land area of approximately 35,000 square meters and a total construction area of approximately 108,000 square meters. The construction content mainly includes an ecological industrial park, intelligent production space, a technology research and development center, etc., forming an intelligent industrial park. After its completion, this project will promote the intelligent development of the energy storage battery industry in the Yuhang District of Hangzhou.
![[SMM Revisión semanal del mercado de celdas de baterías de almacenamiento de energía 9.3] La escasez de láminas de cobre limita los programas de producción de septiembre, los precios de las celdas de baterías de almacenamiento de energía se mantienen firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

