On April 9th, the Zhuhai Hongta Renheng 12MW/24MWh energy storage station, jointly constructed by Chengtong Leasing, Lishen Battery, and Zhongneng Jian Guangdong Institute, was completed. The station will implement a strategy of charging and discharging twice a day during operation period, effectively reducing operating costs by over 100 million yuan.
The project utilizes lithium iron phosphate batteries and outdoor prefabricated deployment, with a planned daily charging and discharging capacity of up to 35,000 kWh. Based on the data from the trial operation phase, the daily electricity savings (non-peak hours) are approximately 21,000 yuan, and during peak summer hours the daily electricity savings are around 28,000 yuan, with an estimated first-year profit expected to reach 8 million yuan.
![[SMM Revisión semanal del mercado de celdas de baterías de almacenamiento de energía 9.3] La escasez de láminas de cobre limita los programas de producción de septiembre, los precios de las celdas de baterías de almacenamiento de energía se mantienen firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Los precios del magnesio suben por tercera sesión consecutiva: el lado de los costos sigue "ardiendo" mientras la demanda lucha por tomar el relevo [Comentario de SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

