On November 24th, the new Inner Mongolia Energy Solar Power EPC project, built by China Energy Construction Anhui Electric Construction Second Company, was fully connected to the grid and started generating electricity.
The project is located in the Shanghaimiao Town of Etokeqianqi, Inner Mongolia Autonomous Region, and covers an area of 511 acres with a total installed capacity of 20.1 megawatts. It adopts a new industrial model of "coal mining subsidence area + photovoltaic desert control", using "power generation on the board, planting under the board, and sand control" to create a green ecological mining area.
After completion, the project will revitalize the idle land in the coal mining subsidence area, drive the restoration of desertified land in the mining area, and play an important role in promoting the coordinated development of local energy development and ecological environment.
![[SMM Noticias FV] ¡A 4.700 metros de altitud! Se ha completado el mayor proyecto fotovoltaico del curso medio y bajo del río Yarlung Zangbo en el Tíbet.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Noticias FV] El Departamento de Energía de EE. UU. (DOE) invierte 12 millones de dólares para desarrollar tecnología fotovoltaica espacial](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Noticias FV] Creando un referente europeo | Se pone en marcha oficialmente el proyecto de sistema de seguimiento de 221 MW de Chiko Solar Energy en Italia](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
