On September 20, the Shanghai Pudong New Area Development and Reform Commission issued the "Notice on Organizing the Second Batch of Photovoltaic Power Generation Special Fund Projects in Pudong New Area in 2023", which proposed that within the scope of the application, subsidies are given according to the installed capacity, with a subsidy of 0.40 yuan/watt (photovoltaic building integrated application (photovoltaic components as building components) project, the subsidy standard is 1 yuan/watt), and the maximum subsidy for a single project is not more than 5 million yuan.
Application scope: From March 1, 2023 to October 31, 2023, photovoltaic power generation projects with a single installed capacity of not less than 200 kilowatts (public institutions installed capacity of not less than 50 kilowatts) in the Pudong New Area (projects implemented in the Lingang area shall be organized by the Lingang New District Management Committee according to the relevant policies of the new district).
![[SMM Noticias FV] ¡A 4.700 metros de altitud! Se ha completado el mayor proyecto fotovoltaico del curso medio y bajo del río Yarlung Zangbo en el Tíbet.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Noticias FV] El Departamento de Energía de EE. UU. (DOE) invierte 12 millones de dólares para desarrollar tecnología fotovoltaica espacial](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Noticias FV] Creando un referente europeo | Se pone en marcha oficialmente el proyecto de sistema de seguimiento de 221 MW de Chiko Solar Energy en Italia](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
