Pilbara iron ore output stood at 79.3 million mt in the first quarter.
Pilbara iron ore shippments stood at 82.5 million mt.
Copper cathode output in the first quarter stood at 130,700 mt, compared with an expected 160,353 mt by the analysts.
The annual bauxite output is still predicted to be 54-57 million mt, versus the expected 55.08 million mt by analysts. The annual capital expenditure is expected to be $8 billion.
![Los precios del cobre retroceden desde máximos y las empresas de varilla de cobre secundaria compran en la caída [Revisión diaria de cobre secundario de SMM]](https://imgqn.smm.cn/usercenter/vcsIC20251217171710.jpg)

![El inventario posvacacional continúa acumulándose, con niveles interanuales aún en mínimos [Datos semanales de SMM]](https://imgqn.smm.cn/usercenter/KytYP20251217171712.jpg)
