Realize the successful opening of the special railway line of Jingye Group for "public rail" and "door-to-door" transport.

Published: Apr 8, 2022 10:48
[realizing the successful opening of the special railway line of Jingye Group for "public rail" and "door-to-door" transport] on the morning of March 31, all the special railway lines of Jingye Group were opened. Newly-built dedicated line 22.508km of Jingye Group, with a total investment of about 2.362 billion yuan. It starts from Xibaipo Station of Shuohuang Railway and passes through 26 villages in 5 townships of Donghuishe Town, Dawu Township, Gangnan Town, Lianghe Township and Nandian Town in Pingshan County to Jingye Group dedication Station at the end of the line. 35.42 million tons of goods can be shipped in the near future and 45.81 million tons in the future, which is expected to reduce the passage of about 1.3 million heavy trucks per year in Pingshan County.

On the morning of March 31, 2022, all the special railway lines of Jingye Group were completed.

Newly-built dedicated line 22.508km of Jingye Group, with a total investment of about 2.362 billion yuan. It starts from Xibaipo Station of Shuohuang Railway and passes through 26 villages in 5 townships of Donghuishe Town, Dawu Township, Gangnan Town, Lianghe Township and Nandian Town in Pingshan County to Jingye Group dedication Station at the end of the line. The newly built special line of Jingye Group is an electrified railway with zero pollutant discharge, with a design speed of 80km/h, a minimum curve radius of 400m, a limited slope of 6 ‰, a traction quality of 5500t and a design axle load of 25t. The main projects of the project are as follows: 5 newly built bridges (4857m), one tunnel (510m), 49 frame culverts and 58200m track laying, including 20500m for main line track laying, 37700m for station line track laying and 5.24 million m ³for earthwork of the whole line.

The dedicated railway line of Jingye Group was officially launched in August 2020 and completed on March 31, 2022, which took 19 months. After opening to traffic, Jingye Group's raw materials such as mineral powder and bulk goods such as steel can be transported "door to door". The goods can be transported 35.42 million tons in the near future and 45.81 million tons in the future. It is expected to reduce the traffic of about 1.3 million heavy trucks per year in Pingshan County, effectively reduce road dust and vehicle exhaust emissions, promote the adjustment and upgrading of transport structure, and build a green low-carbon logistics system. It is of great significance to speed up the improvement of urban and rural environmental air quality and stimulate the vitality of regional economic development.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
May 9, 2026 20:23
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Read More
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
[Waste Lead-Acid Battery Market Dynamics] It was reported that one waste lead-acid battery collection and storage entity has been established in Zhangye City, Gansu Province, namely Zhangye Mingcheng Waste Battery Recycling Co., Ltd., which has obtained the Hazardous Waste Operating License issued by the Department of Ecology and Environment of Gansu Province. The approved operating method and category is the collection (HW31, 900-52) of waste lead-acid batteries, with an operating capacity of 2,000 mt/year. A total of 4 waste lead-acid battery collection sites have been set up across the city.
May 9, 2026 20:23
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27