National Health Commission: 78 new confirmed cases and 68 local cases yesterday

Publicado: Nov 5, 2021 09:12
[national Health Commission: 78 new confirmed cases yesterday 68 local cases] from 0 to 24:00 on November 4, 78 new confirmed cases were reported in 31 provinces (autonomous regions, municipalities directly under the Central Government) and the Xinjiang production and Construction Corps. Among them, there were 10 imported cases and 68 local cases.

From 0 to 24:00 on November 4, 78 new confirmed cases were reported in 31 provinces (autonomous regions and municipalities directly under the Central Government) and the Xinjiang production and Construction Corps, according to a dynamic release on the official website of the National Health Commission. Among them, 10 cases were imported from abroad (3 cases from Shanghai, 3 cases from Guangxi, 1 case from Tianjin, 1 case from Liaoning, 1 case from Guangdong, 1 case from Yunnan), including 1 case from asymptomatic infection to confirmed case (in Guangxi). There were 68 local cases (28 in Heilongjiang, all in Heihe; 10 in Hebei, including 9 in Shijiazhuang and 1 in Xinji; 8 in Liaoning, all in Dalian; 5 in Henan, all in Zhengzhou). There were 5 cases in Gansu, including 4 in Lanzhou, 1 in Tianshui, 4 in Ningxia, all in Yinchuan, 2 in Inner Mongolia, all in Alashan League, 2 in Jiangxi, both in Shangrao City, 2 in Sichuan, all in Chengdu, 1 in Guizhou, in Zunyi City, and 1 in Yunnan, including 4 cases changed from asymptomatic infection to confirmed cases (all in Henan). There were no new deaths. One new suspected case was imported from abroad (in Shanghai).

On the same day, 29 new cases were cured and discharged from hospital, 1990 close contacts were relieved from medical observation, and one more severe case was found than the previous day.

There are 373 confirmed cases (including 2 severe cases) and 4 suspected cases imported from abroad. A total of 9697 cases were confirmed, 9324 cases were cured and discharged, and there were no deaths.

As of 24:00 on November 4, according to reports from 31 provinces (autonomous regions, municipalities directly under the Central Government) and the Xinjiang production and Construction Corps, there were 1129 confirmed cases (including 37 severe cases), a total of 91840 cured and discharged cases, and a cumulative death of 4636 cases. a total of 97605 confirmed cases and 4 suspected cases have been reported. A total of 1272333 close contacts were tracked and 45386 were still under medical observation.

42 new asymptomatic infections were reported in 31 provinces (autonomous regions, municipalities directly under the Central Government) and Xinjiang production and Construction Corps, of which 20 were imported from abroad and 22 from home (9 in Henan, all in Zhengzhou; 8 in Liaoning, all in Dalian; 3 in Jiangxi, all in Shangrao; 2 in Chongqing, including 1 in Shapingba District and 1 in Yubei District); 5 cases were converted to confirmed cases on the same day (1 case imported from abroad). On the same day, 17 cases were relieved of medical observation (14 cases were imported from abroad), and 426 cases of asymptomatic infection were still under medical observation (348 cases were imported from abroad).

A total of 28866 confirmed cases have been reported from Hong Kong, Macao and Taiwan. Among them, 12359 cases were discharged from the Hong Kong Special Administrative region (12035 cases were discharged and 213 died), 77 cases were discharged from the Macao Special Administrative region (75 cases were discharged) and 16430 cases were discharged from Taiwan (13742 cases were discharged and 847 cases died).

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
【Análisis de SMM】Implats 2010 a 2025: Por qué más metal no siempre significa más dinero
hace 18 horas
【Análisis de SMM】Implats 2010 a 2025: Por qué más metal no siempre significa más dinero
Leer más
【Análisis de SMM】Implats 2010 a 2025: Por qué más metal no siempre significa más dinero
【Análisis de SMM】Implats 2010 a 2025: Por qué más metal no siempre significa más dinero
El historial operativo de Implats de 2010 a 2025 muestra por qué una mayor producción no siempre implica mayores beneficios. Los precios de los metales, las interrupciones operativas, las adquisiciones y los movimientos cambiarios marcaron el desempeño. Los precios del paladio y del rodio cayeron bruscamente después del ejercicio 2021. Los resultados del ejercicio 2026 muestran una recuperación, pero una fortaleza duradera depende de operaciones seguras, procesamiento fiable, costes disciplinados y de convertir el metal en efectivo, en lugar de depender únicamente de precios favorables.
hace 18 horas
[SMM Metales Preciosos Exprés]
hace 23 horas
[SMM Metales Preciosos Exprés]
Leer más
[SMM Metales Preciosos Exprés]
[SMM Metales Preciosos Exprés]
Implats está reevaluando el valor estratégico de su proyecto de PGM Waterberg. La dirección de la empresa declaró recientemente que el plan revisado de Waterberg, tras la reducción de escala y la optimización de los costes de capital, es más atractivo que las versiones anteriores, y el proyecto ha vuelto a entrar en la cartera de crecimiento futuro del grupo. Este avance también refleja una realidad cada vez más acuciante para la industria sudafricana de PGM: los proyectos capaces de ofrecer una producción incremental con menor riesgo y una intensidad de capital razonable son cada vez más escasos.
hace 23 horas
[SMM Metales Preciosos Exprés]
hace 23 horas
[SMM Metales Preciosos Exprés]
Leer más
[SMM Metales Preciosos Exprés]
[SMM Metales Preciosos Exprés]
Un importante proyecto de hidrógeno verde en Sudáfrica ha dado otro paso clave. Hive Hydrogen South Africa anunció el 15 de septiembre que ha adjudicado formalmente el contrato de ingeniería de diseño de front-end (FEED) para su proyecto de hidrógeno verde y amoníaco verde de aproximadamente 5.800 millones de dólares a la empresa de ingeniería española Técnicas Reunidas. El proyecto, que se encuentra en una fase avanzada de desarrollo, está considerado como una iniciativa emblemática de hidrógeno verde en Sudáfrica y uno de los proyectos de demostración clave del programa Global Gateway de la Unión Europea en el país.
hace 23 horas