National Health Commission: 39 new confirmed cases and 23 local cases yesterday

Publicado: Oct 28, 2021 08:51
[national Health Commission: 39 new confirmed cases yesterday 23 local cases] from 0 to 24:00 on October 27, 31 provinces (autonomous regions, municipalities directly under the Central Government) and Xinjiang production and Construction Corps reported 39 new confirmed cases. There were 16 imported cases and 23 local cases.

From 0 to 24:00 on October 27, 31 provinces (autonomous regions, municipalities directly under the Central Government) and Xinjiang production and Construction Corps reported 39 new confirmed cases, according to the official website of the National Health Commission. Among them, 16 cases were imported from abroad (8 in Zhejiang, 3 in Henan, 2 in Fujian, 1 in Beijing, 1 in Hubei and 1 in Guangxi), including 8 cases from asymptomatic infection to confirmed cases (all in Zhejiang). There were 23 local cases (8 in Gansu, including 4 in Zhangye, 1 in Lanzhou, 1 in Lanzhou, 2 in Jiayuguan, 7 in Inner Mongolia, all in Alashan League, and 3 in Beijing, all in Changping District. There were 2 cases in Ningxia, both in Yinchuan City, 1 case in Heilongjiang Province, 1 case in Heihe City, 1 case in Shandong Province, 1 case in Rizhao City, and 1 case in Sichuan City), including 2 cases changed from asymptomatic infection to confirmed case (1 case in Beijing and 1 case in Sichuan). There were no new deaths. There were no new suspected cases.

On the same day, 23 new cases were cured and discharged from hospital, 966 were in close contact with medical observation, and 6 severe cases were increased compared with the previous day.

There are 378 confirmed cases (including 1 severe case) and 3 suspected cases imported from abroad. A total of 9546 cases were confirmed, 9168 cases were cured and discharged, and there were no deaths.

As of 24:00 on October 27th, according to reports from 31 provinces (autonomous regions, municipalities directly under the Central Government) and the Xinjiang production and Construction Corps, there were 659 confirmed cases (including 33 severe cases), a total of 91643 cured and discharged cases, and a cumulative death of 4636 cases. a total of 96938 confirmed cases and 4 suspected cases have been reported. A total of 1240694 close contacts were tracked and 39121 were still under medical observation.

31 new asymptomatic infections were reported in 31 provinces (autonomous regions, municipalities directly under the Central Government) and Xinjiang production and Construction Corps, including 20 imported cases and 11 local cases (4 in Shandong, all in Rizhao; 3 in Heilongjiang, all in Heihe City; 2 in Beijing, all in Changping District; 2 in Yunnan, all in Dehong Dai Jingpo Autonomous Prefecture); 10 confirmed cases were converted to confirmed cases on the same day (8 imported from abroad). On the same day, 5 cases were relieved of medical observation (all imported from abroad), and 408 cases of asymptomatic infection were still under medical observation (366 cases were imported from abroad).

A total of 28800 confirmed cases have been reported from Hong Kong, Macao and Taiwan. Among them, 12335 cases were discharged from the Hong Kong Special Administrative region (12033 cases were discharged and 213 died), 77 cases were discharged from the Macao Special Administrative region (66 cases were discharged) and 16388 cases were discharged from Taiwan (13742 cases were discharged and 847 cases died).

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
[SMM Metales Preciosos Exprés]
hace 4 horas
[SMM Metales Preciosos Exprés]
Leer más
[SMM Metales Preciosos Exprés]
[SMM Metales Preciosos Exprés]
Implats está reevaluando el valor estratégico de su proyecto de PGM Waterberg. La dirección de la empresa declaró recientemente que el plan revisado de Waterberg, tras la reducción de escala y la optimización de los costes de capital, es más atractivo que las versiones anteriores, y el proyecto ha vuelto a entrar en la cartera de crecimiento futuro del grupo. Este avance también refleja una realidad cada vez más acuciante para la industria sudafricana de PGM: los proyectos capaces de ofrecer una producción incremental con menor riesgo y una intensidad de capital razonable son cada vez más escasos.
hace 4 horas
[SMM Metales Preciosos Exprés]
hace 4 horas
[SMM Metales Preciosos Exprés]
Leer más
[SMM Metales Preciosos Exprés]
[SMM Metales Preciosos Exprés]
Un importante proyecto de hidrógeno verde en Sudáfrica ha dado otro paso clave. Hive Hydrogen South Africa anunció el 15 de septiembre que ha adjudicado formalmente el contrato de ingeniería de diseño de front-end (FEED) para su proyecto de hidrógeno verde y amoníaco verde de aproximadamente 5.800 millones de dólares a la empresa de ingeniería española Técnicas Reunidas. El proyecto, que se encuentra en una fase avanzada de desarrollo, está considerado como una iniciativa emblemática de hidrógeno verde en Sudáfrica y uno de los proyectos de demostración clave del programa Global Gateway de la Unión Europea en el país.
hace 4 horas
[SMM Metales Preciosos Exprés]
hace 4 horas
[SMM Metales Preciosos Exprés]
Leer más
[SMM Metales Preciosos Exprés]
[SMM Metales Preciosos Exprés]
Valterra Platinum afirmó que su mina de PGM Mogalakwena en Limpopo, Sudáfrica, cuenta con una base de recursos a largo plazo excepcionalmente grande. El Jefe Ejecutivo de Operaciones Mineras señaló en una sesión informativa para medios sobre la cadena de valor que Mogalakwena posee aproximadamente 285 millones de onzas de recursos sobre una base de cuatro elementos (4E). Según el objetivo de producción anual planificado por la empresa de seis elementos (6E) de 900.000 a 1 millón de onzas, la vida potencial de los recursos de la mina podría superar los 300 años.
hace 4 horas