China’s silicon metal output dipped in April amid more maintenance

Publicado: May 13, 2021 11:39 (GMT+8)
China produced 197,000 mt of silicon metal in April, shrinking 5,000 mt or 2.4% from the month before, SMM data showed, as more capacities in Xinjiang and Yunnan came under maintenance.

SHANGHAI, May 13 (SMM)—China produced 197,000 mt of silicon metal in April, shrinking 5,000 mt or 2.4% from the month before, SMM data showed, as more capacities in Xinjiang and Yunnan came under maintenance. 


Silicon plants in Yunnan Nujiang have postponed resumption to mid-March as local electricity prices remained undetermined after the Labour Day holiday. Although Sichuan has entered a normal-water period since April 25, only a few silicon plants have restarted production. Most of the producers in Yunnan and Sichuan are expected to restore production in June, a high water period. 
Silicon metal output is likely to rise slightly to about 220,000 mt in May.  
According to Hesheng’s plan, its annual output is expected to be around 800,000 mt in 2021, a net increase of 300,000 mt over 2020. East Hope, which has recovered from production accidents, will also contribute some output, but postponed resumption and the shortage of power supply will shorten the production period in southwest producing area. China’s silicon metal output is likely to total 2.5 million mt in 2021, rising 300,000 mt or 14% from a year earlier. 

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
Liberia survey flags early-stage anomalies across Zodiac licences
hace 4 minutos
Liberia survey flags early-stage anomalies across Zodiac licences
Leer más
Liberia survey flags early-stage anomalies across Zodiac licences
Liberia survey flags early-stage anomalies across Zodiac licences
[SMM Tantalum & Niobium Flash] Zodiac Gold has completed 10,661 soil samples across 530 km² of its Bomi South and Bong West licences in Liberia. National stream-sediment maps place parts of the licence package within the top 0.5% of Liberia’s dataset for 16 elements, including tantalum and niobium. Zodiac’s portable-XRF screening of 2,270 soil samples returned niobium values up to 61 ppm; the release provided no corresponding quantified tantalum soil result. The findings broaden the licences beyond their primary gold focus and identify areas for follow-up mapping and infill sampling. They remain reconnaissance evidence, not a tantalum or niobium discovery: portable-XRF readings are preliminary, most samples have not yet been screened for multiple elements, and no drilling, mineral resource, metallurgy or economic study has established recoverable mineralisation.
hace 4 minutos
【Flash | El plan de zinc H2 de DOWA sube un 27%, lo que podría respaldar la recuperación de indio】
hace 4 horas
【Flash | El plan de zinc H2 de DOWA sube un 27%, lo que podría respaldar la recuperación de indio】
Leer más
【Flash | El plan de zinc H2 de DOWA sube un 27%, lo que podría respaldar la recuperación de indio】
【Flash | El plan de zinc H2 de DOWA sube un 27%, lo que podría respaldar la recuperación de indio】
DOWA Holdings planea producir 113.543 toneladas de zinc en el segundo semestre del año fiscal 2026, un 27,0 % más que su plan del primer semestre de 89.373 toneladas y un 26,8 % más que las 89.525 toneladas producidas en el segundo semestre del año fiscal 2025. Su operación Akita Zinc utiliza el proceso de hematita para recuperar indio y otros metales valiosos con altos rendimientos e integra la fundición de zinc con la producción y el reciclaje de metales raros. Una mayor producción planificada de zinc puede aumentar el procesamiento de material para la recuperación de indio como subproducto. Sin embargo, DOWA no reveló ningún objetivo de producción de indio, y cualquier aumento de la oferta dependerá de las leyes del material, las tasas de recuperación y los programas operativos, más que de los volúmenes de zinc por sí solos.
hace 4 horas
【Flash | El programa financiado por BHP avanza en la perforación del objetivo de cobre-oro-molibdeno El Destino en Argentina】
hace 4 horas
【Flash | El programa financiado por BHP avanza en la perforación del objetivo de cobre-oro-molibdeno El Destino en Argentina】
Leer más
【Flash | El programa financiado por BHP avanza en la perforación del objetivo de cobre-oro-molibdeno El Destino en Argentina】
【Flash | El programa financiado por BHP avanza en la perforación del objetivo de cobre-oro-molibdeno El Destino en Argentina】
Kobrea Exploration Corp. anunció la aprobación de un programa de exploración de 4 millones de dólares para 2026/27 en el Distrito Minero Malargüe Occidental, en la provincia de Mendoza, Argentina, financiado íntegramente por BHP. El programa incluye perforación diamantina en el objetivo de pórfido de cobre-oro-molibdeno El Destino, estudios de polarización inducida en El Destino y KBX-17, así como mapeo geológico, muestreo geoquímico y trabajos hiperespectrales. La alianza de exploración abarca siete proyectos que totalizan aproximadamente 733 kilómetros cuadrados, donde se han identificado anomalías geoquímicas de cobre, oro y molibdeno. Análisis de SMM: la aprobación del nuevo presupuesto lleva la asociación BHP-Kobrea de un marco de alianza a una fase activa de perforación. Sin embargo, las propiedades siguen en una etapa temprana de exploración, sin molibdeno
hace 4 horas