Φ 18mm rebar was successfully rolled in batch for the first time in Beiying Rolling Plant of Benxi Iron and Steel Co., Ltd.

Published: Sep 14, 2020 13:32
Source: Benxi steel

SMM: a few days ago, Beiying Rolling Mill successfully rolled national standard seismic rebar HRB400E Φ 18mm rebar in batches for the first time, overcoming the problem of rolling the limit specification rebar product per unit production line in one fell swoop. After inspection, the size of the product is qualified, the surface quality is good, all the performance indicators meet the requirements, and the qualified rate of the first inspection performance reaches 100%, which marks a new breakthrough in the production of the limit specification products of Benxi Iron and Steel Co., Ltd., and adds new strength for the enterprise to expand the market.

The Φ 18mm rebar produced this time belongs to the limit specification rebar within the design scope, which is mainly used in construction bodies such as buildings, bridges, tunnels and airports in major cities in China, and belongs to the products with grade requirements for anti-Earthquake. Because of its great difficulty in performance control, stable heating temperature, high requirements for steel bar size and poor yield performance, and great difficulty in batch production, this product is also a comprehensive test of rolling mill technology, operation level and equipment accuracy.

In order to ensure the success of a trial rolling, the factory organizes professional and technical personnel to overcome the difficulties of basic product data and lack of experience, hold special meetings for many times to study the rolling plan, optimize the key points of the steel rolling process, improve the process control ability, further optimize the process operation, strengthen process monitoring, strictly control the temperature control system and air-cooled water cooling system, and control every process production link and critical control point. Regional responsible persons and supervisors are determined to ensure the effective implementation of the rolling process and to achieve trial rolling and batch production in the shortest possible time. At present, the highest daily output is 2481 tons, and the comprehensive yield is 101.2%. The contract delivery task has been successfully completed and the market competitiveness of enterprises has been further enhanced.

"Click to understand and sign up: 2020 China Automotive New Materials Application Summit Forum

Scan the QR code above to view the business cards of the participating companies and sign up online

Scan the code and apply to join the SMM Automotive Industry Exchange Group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05
Φ 18mm rebar was successfully rolled in batch for the first time in Beiying Rolling Plant of Benxi Iron and Steel Co., Ltd. - Shanghai Metals Market (SMM)