Analysis: Zinc price sees further upward room

Publicado: Jan 30, 2018 08:50 (GMT+8)
As the SHFE 1803 zinc contract refreshed its 10-year high and touched 27,235 yuan/mt on Monday January 29, SMM believes new highs may continue to be made.

SHANGHAI, Jan 30 (SMM) – As the SHFE 1803 zinc contract refreshed its 10-year high and touched 27,235 yuan/mt on Monday January 29, SMM believes new highs may continue to be made.

Such strong momentum can be attributed to stronger Chinese yuan, declining inventory, and more fund liquidity.

With LME zinc inventory coming down to below the 180,000 mt level and a spot premium of over $20/mt, more warrants have been cancelled and market sentiment remained bullish.

In China, zinc concentrate supply stayed tight. Deliveries have also been affected due to poor weather. Social inventories in the three major markets have declined for two consecutive weeks to just below 140,000 mt, according to SMM data.

In addition, an inflow of 514 million yuan to the SHFE zinc contracts indicated better fund liquidity and investor enthusiasm.

We maintain our view that zinc would stay firm in the first half of this year but a small correction is expected in the near term.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn   

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
【Flash | Los motores ópticos de IA integrados en InP entran en envíos por volumen】
25 Sep 2026 14:32 (GMT+8)
【Flash | Los motores ópticos de IA integrados en InP entran en envíos por volumen】
Leer más
【Flash | Los motores ópticos de IA integrados en InP entran en envíos por volumen】
【Flash | Los motores ópticos de IA integrados en InP entran en envíos por volumen】
NewPhotonics y Tower Semiconductor anunciaron envíos en gran volumen de motores ópticos integrados con láser para infraestructura de IA. Los PIC de 800G y 1,6T utilizan la plataforma de fotónica de silicio PH18DA de Tower con componentes de InP integrados de forma heterogénea, lo que permite integrar láseres, SOA, moduladores y fotodetectores en un solo chip. Los envíos en volumen de chipsets NPO de 6,4T están previstos para el primer semestre de 2027. SMM considera que esto indica que la demanda de interconexión óptica para IA se está traduciendo en demanda de dispositivos de InP, lo que respalda el consumo de indio de alta pureza. Sin embargo, no se revelaron los volúmenes de envío ni la intensidad de uso de InP, por lo que el incremento del consumo de indio a corto plazo aún no puede cuantificarse.
25 Sep 2026 14:32 (GMT+8)
Blue Moon adquirirá el yacimiento VMS de cobre-oro-zinc Turner con recursos históricos de zinc
25 Sep 2026 09:58 (GMT+8)
Blue Moon adquirirá el yacimiento VMS de cobre-oro-zinc Turner con recursos históricos de zinc
Leer más
Blue Moon adquirirá el yacimiento VMS de cobre-oro-zinc Turner con recursos históricos de zinc
Blue Moon adquirirá el yacimiento VMS de cobre-oro-zinc Turner con recursos históricos de zinc
Blue Moon Metals anunció la firma de un acuerdo definitivo para adquirir el 100 % del yacimiento de sulfuros masivos volcanogénicos (VMS) de cobre y oro Turner en Oregón a Gold Coast Mining. La contraprestación comprende 4,7 millones de dólares en efectivo, 4.778.761 acciones de Blue Moon valoradas en unos 27 millones de dólares según el precio medio ponderado por volumen de 20 días, y hasta 7 millones de dólares en pagos por hitos vinculados a los permisos de exploración y desarrollo subterráneo, permisos mineros y producción comercial. Se prevé que el cierre tenga lugar en noviembre de 2026, sujeto a la aprobación de la Bolsa de Valores TSX y a las condiciones habituales. Turner es un yacimiento VMS de tipo Chipre que ya ha producido y contiene cobre, oro, zinc, plata y cobalto. Su estimación histórica de 2010 reportó 2,447 millones de toneladas cortas de material indicado con una ley del 2,65 % de zinc y 2,084 millones de toneladas cortas de material inferido con una ley del 2,78 % de zinc. La empresa prevé que la obtención de permisos para perforación de exploración y desarrollo subterráneo tarde entre 12 y 18 meses.
25 Sep 2026 09:58 (GMT+8)
Demanda de uso final decepciona y las tasas operativas del óxido de zinc bajan [Revisión semanal del óxido de zinc de SMM]
24 Sep 2026 17:22 (GMT+8)
Demanda de uso final decepciona y las tasas operativas del óxido de zinc bajan [Revisión semanal del óxido de zinc de SMM]
Leer más
Demanda de uso final decepciona y las tasas operativas del óxido de zinc bajan [Revisión semanal del óxido de zinc de SMM]
Demanda de uso final decepciona y las tasas operativas del óxido de zinc bajan [Revisión semanal del óxido de zinc de SMM]
[El débil desempeño de la demanda final reduce la tasa operativa del óxido de zinc] Desde la perspectiva del desempeño de la demanda final, en el sector del óxido de zinc de grado caucho, los pedidos de las empresas de neumáticos son generalmente débiles y las compras de óxido de zinc se mantienen justo a tiempo; los pedidos en el campo de la desulfuración tienen un desempeño deficiente, con una demanda que sigue siendo lenta...
24 Sep 2026 17:22 (GMT+8)