Rusal to Resume Production at Guinea FRIGUIA Alumina Refinery in April 2018

Publicado: May 22, 2017 11:46
Reconstruction work at Rusal’s FRIGUIA alumina refinery in Guinea is proceeding smoothly, with about 35% already completed.

SHANGHAI, May 22 (SMM) – Reconstruction work at Rusal’s FRIGUIA alumina refinery in Guinea is proceeding smoothly, with about 35% already completed. 

Reconstruction work at the refinery is scheduled to be completed in April 2018 when the refinery will have an annual alumina capacity of 650,000 tonnes, Pavel Vassiliev, General Manager at Rusal’s Guinea branch said. 

Bauxite Imports by Weihai Port Hit Multi-Year High

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
 

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn