Zijin Mining Put 3.3 Million-tpy Lead and Zinc Ore Processing Project into Trial Production

Publicado: Sep 23, 2015 12:09 (GMT+8)
Zijin Mining entered trial production of its 3.3 million-tpy lead and zinc ore processing project in Inner Mongolia’s Urat Rear Banner, bynrnews.com reports.

SHANGHAI, Sept. 23 (SMM) - Zijin Mining entered trial production of its 3.3 million-tpy lead and zinc ore processing project in Inner Mongolia’s Urat Rear Banner recently, bynrnews.com reports.

The project was commenced in 2009, and is scheduled for commissioning in the latter half of this year. Once operational, its daily ore processing capacity will reach 10,000 tonnes. The project’s zinc ore output will be 70,000 tpy (zinc content), with lead ore output of 10,000 tpy (lead content) and 360,000 tpy of standard sulfur. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 


Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn