Hybar to build second rebar minimill in Arkansas for 1.1 billion USD
Hybar Steel plans a second rebar minimill at Osceola, Arkansas, for 1.1 billion USD, after starting its first unit in 2025. The first plant launched in August 2023 with 1 billion USD of financing, was completed in 22 months on a 1,300-acre greenfield site, and includes a Mississippi River port plus the largest behind-the-meter solar and battery storage facility in the US; Hybar says it is the only North American producer able to run on 100% renewable power. Founder Dave Stickler earlier built Big River Steel, whose 1.3 billion USD mill broke ground in 2014. U.S. Steel bought 49.9% for 700 million USD in 2019; in April it announced a 2 billion USD expansion at Big River Steel Works with 200 new jobs. The projects underline accelerating US minimill rebar and low-carbon capacity growth.