[SMM Coal Flash] Indonesia’s 2027 Power Sector Coal Demand Projected at 173.83 Million Tonnes

Published: Nov 04, 2026 20:07 (GMT+8)

Indonesia’s coal demand for power generation is projected to reach 173.83 million tonnes in 2027, comprising approximately 89 million tonnes of medium-rank coal (MRC) and 76 million tonnes of low-rank coal (LRC), according to PLN Energi Primer Indonesia (PLN EPI). PLN Group’s coal demand is estimated at 83.84 million tonnes, while IPPs require around 75.99 million tonnes.

Most Indonesian power plants are designed to use MRC, while domestic coal reserves are dominated by LRC, creating a supply mismatch. PLN EPI is considering upgrading power plant facilities to accommodate lower-calorie coal, although the process requires significant investment and time.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Coal Flash] India Targets Tripling Power Plant Coal Stocks to 55 Million Tonnes by March 2027
45 mins ago
[SMM Coal Flash] India Targets Tripling Power Plant Coal Stocks to 55 Million Tonnes by March 2027
Read More
[SMM Coal Flash] India Targets Tripling Power Plant Coal Stocks to 55 Million Tonnes by March 2027
[SMM Coal Flash] India Targets Tripling Power Plant Coal Stocks to 55 Million Tonnes by March 2027
India aims to nearly triple coal inventories at power plants from around 18 million tonnes to at least 55 million tonnes by March 2027, ahead of next summer’s peak electricity demand. The target was jointly set by the coal, power and railways ministries to reduce the risk of power shortages. Current coal stocks cover around six days of consumption, below the government’s target of three weeks. Coal India and Indian Railways are increasing coal production, dispatches and rail capacity to replenish inventories, while priority supplies to power plants have left industrial users, including captive power plants, facing tighter coal availability.
45 mins ago
[SMM Coal Flash] Coal Supply Disruptions Cost SIG 1.7 Million Tonnes in Potential Cement Production
46 mins ago
[SMM Coal Flash] Coal Supply Disruptions Cost SIG 1.7 Million Tonnes in Potential Cement Production
Read More
[SMM Coal Flash] Coal Supply Disruptions Cost SIG 1.7 Million Tonnes in Potential Cement Production
[SMM Coal Flash] Coal Supply Disruptions Cost SIG 1.7 Million Tonnes in Potential Cement Production
PT Semen Indonesia (SIG) lost around 1.7 million tonnes of potential cement production in 2026 after delayed or unavailable coal deliveries forced kilns at several plants to suspend operations more than ten times. Indonesia’s cement industry requires around 15 million tonnes of coal annually. SIG said coal supply remains difficult to secure as miners prioritise deliveries to PLN and export markets.
46 mins ago
[SMM Coal Flash] PTBA Plans to Reactivate Ombilin Mine, Targeting High-Calorie Coal Production
46 mins ago
[SMM Coal Flash] PTBA Plans to Reactivate Ombilin Mine, Targeting High-Calorie Coal Production
Read More
[SMM Coal Flash] PTBA Plans to Reactivate Ombilin Mine, Targeting High-Calorie Coal Production
[SMM Coal Flash] PTBA Plans to Reactivate Ombilin Mine, Targeting High-Calorie Coal Production
Indonesia’s state-owned coal miner PT Bukit Asam (PTBA) is preparing to reactivate the Ombilin coal mine in Sawahlunto, West Sumatra, which ceased operations in 2015. Recent exploration identified an additional 1.82 million tonnes of coal reserves, with an average calorific value above 6,500 kcal/kg and reaching 7,000 kcal/kg. PTBA targets annual production of 300,000-500,000 tonnes, with the additional reserves expected to support operations for four to five years. Open-pit mining at Langkok Block is expected to begin in Q4 2026, while initial mining activities are targeted for early 2027. The company has also identified around 100 million tonnes of potential coal deposits beneath the urban area, although development remains challenging.
46 mins ago