Guinean Bauxite Shipment via Beibu Gulf Port Reduces Transit Time by 25 Days, Ensures Stable Supply to Chongqing
According to Beibu Gulf Port Co., Ltd. on October 7, a vessel carrying 168,000 tonnes of Guinean imported bauxite successfully berthed at Fangchenggang Port on October 1, efficiently completing the entire chain of berthing and discharge, storage, and railway outbound transport. The first batch of cargo was shipped by rail to Wanzhou, Chongqing, on October 3, effectively ensuring a stable supply of raw materials for Bosai Minerals' Wanzhou production base. This newly established Guinean bauxite logistics route innovatively creates a rail-sea intermodal model of "overseas mine – entry via Beibu Gulf Port – direct rail to Chongqing." Compared with the traditional Yangtze River sea-river intermodal route, the overall transit time is shortened by about 25 days.