Hydropower Station at Highest Altitude on Yellow River Mainstream Sets Record for Power Generation

Published: Oct 13, 2026 14:09 (GMT+8)
According to China News Service, on October 5, it was learned from the Maerdang Hydropower Station of CHN Energy Qinghai Company that as of that date, the station's cumulative power generation for the year had exceeded 5 billion kWh, up about 21.51% compared to the same period last year, setting a record high for the same period in history.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
CNNC: Cumulative Commercial Power Generation Up 1.25% YoY in First Three Quarters
56 mins ago
CNNC: Cumulative Commercial Power Generation Up 1.25% YoY in First Three Quarters
Read More
CNNC: Cumulative Commercial Power Generation Up 1.25% YoY in First Three Quarters
CNNC: Cumulative Commercial Power Generation Up 1.25% YoY in First Three Quarters
CNNC announced in an evening filing that as of September 30, 2026, the company's cumulative commercial power generation for the first three quarters of 2026 was 186.66 billion kWh, up 1.25% YoY; on-grid power was 176.053 billion kWh, up 1.12% YoY.
56 mins ago
World's tallest steel-concrete hybrid tower wind turbine connected to grid
1 hour ago
World's tallest steel-concrete hybrid tower wind turbine connected to grid
Read More
World's tallest steel-concrete hybrid tower wind turbine connected to grid
World's tallest steel-concrete hybrid tower wind turbine connected to grid
On September 30, the world's tallest steel-concrete hybrid tower wind turbine was officially connected to the grid in Xinji, Hebei province, marking a new breakthrough in China's ultra-tall steel-concrete hybrid tower technology and reaching an internationally advanced level. The unit is a landmark demonstration unit of the China Huadian Xinji wind power project cluster, a key construction project in Hebei province. Its hub center height reaches 204 meters, equivalent to a 70-story residential building, enabling full utilization of stable, high-quality wind resources at high altitudes and lowering the threshold for low-wind-speed wind power development to below 4.5 m/s.
1 hour ago
National Energy Administration releases green electricity certificate issuance and trading data
1 hour ago
National Energy Administration releases green electricity certificate issuance and trading data
Read More
National Energy Administration releases green electricity certificate issuance and trading data
National Energy Administration releases green electricity certificate issuance and trading data
On September 30, the National Energy Administration released the national renewable energy green electricity certificate issuance and trading data for August 2026. In terms of green certificate issuance, in August 2026, the National Energy Administration issued 354 million green certificates, up 15.75% MoM, involving 3.7096 million renewable energy power generation projects, of which 212 million were tradable green certificates, accounting for 60.04%. In terms of green certificate trading, in August 2026, 60.55 million green certificates were traded nationwide, up 11.13% MoM and up 25.18% YoY. Among them, 25.52 million green certificates were traded through green power trading, down 0.25% MoM and up 44.86% YoY.
1 hour ago