SHFE zinc opened higher with a gap in the night session, boosted by LME [SMM Zinc Morning Comment]

Published: Oct 12, 2026 08:55 (GMT+8)
[SMM Zinc Morning Comment: SHFE Zinc Opens Higher with a Gap in Night Session Boosted by LME] Last Friday, the most-traded SHFE zinc 2611 contract opened at 26,080 yuan/mt. After the open, SHFE zinc continued to consolidate at highs, dipping to a low of 26,040 yuan/mt in early trading and touching a high of 26,215 yuan/mt near the close, ultimately closing up at 26,210 yuan/mt, up 280 yuan/mt, or 1.08%. Trading volume decreased to 50,372 lots, and open interest fell by 1,658 lots to 106,000 lots.

SMM, October 12:

Last Friday, LME zinc opened at $3,718/mt. After the open, LME zinc rose throughout the session, dipping to a low of $3,710/mt in early trading and touching a high of $3,811.5/mt near the close, ultimately settling up at $3,801.5/mt, up $91.5/mt, or 2.47%. Trading volume decreased to 13,406 lots, and open interest fell by 2,778 lots to 255,000 lots. Last Friday, LME zinc formed a bullish candlestick, with support from the lower Bollinger Band. LME inventory continued to consolidate, and the 0-3 backwardation structure widened slightly again from low levels, providing some support to zinc prices. Bears reduced positions, and LME zinc rebounded notably from lows. Short-term consolidation is expected to persist.

Last Friday, the most-traded SHFE zinc 2611 contract opened at 26,080 yuan/mt. After the open, SHFE zinc continued to consolidate at highs, dipping to a low of 26,040 yuan/mt in early trading and touching a high of 26,215 yuan/mt near the close, ultimately settling up at 26,210 yuan/mt, up 280 yuan/mt, or 1.08%. Trading volume decreased to 50,372 lots, and open interest fell by 1,658 lots to 106,000 lots. Last Friday, SHFE zinc formed a bullish candlestick, with support from the 5-day moving average below. Driven by the rebound in the LME market, SHFE zinc opened higher with a gap in the night session. On the fundamentals side, smelters showed relatively weak production enthusiasm due to profit pressures, while downstream consumption remained mediocre. Bulls and bears continued to wrestle, and continued consolidation is expected.

Data source statement: All data other than public information are processed by SMM based on public information, market communication, and SMM's internal database models. They are for reference only and do not constitute investment advice.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
DPM's Vareš Mine Targets 850,000-Tonne Annualised Throughput
3 mins ago
DPM's Vareš Mine Targets 850,000-Tonne Annualised Throughput
Read More
DPM's Vareš Mine Targets 850,000-Tonne Annualised Throughput
DPM's Vareš Mine Targets 850,000-Tonne Annualised Throughput
DPM Metals Inc. released preliminary third-quarter 2026 production results. Its Vareš polymetallic mine in Bosnia and Herzegovina processed approximately 143,000 tonnes of ore, producing concentrates containing approximately 28 million pounds of zinc and 17 million pounds of lead. Payable metal in concentrate sold during the quarter amounted to approximately 16 million pounds of zinc and 12 million pounds of lead. For the first nine months of 2026, Vareš produced concentrates containing approximately 52 million pounds of zinc and 35 million pounds of lead. DPM declared commercial production at Vareš, while the operation continues to ramp up toward an annualized production run-rate of 850,000 tonnes per year by the end of 2026. Construction of the second tailings filter and paste backfill plant is nearing completion, with commissioning expected to begin in November and December, respectively.
3 mins ago
【SMM Flash News】GoldHaven Begins Drilling at D Zone Silver-Lead-Zinc Target After Completing 1,729 Metres at Kuhn
59 mins ago
【SMM Flash News】GoldHaven Begins Drilling at D Zone Silver-Lead-Zinc Target After Completing 1,729 Metres at Kuhn
Read More
【SMM Flash News】GoldHaven Begins Drilling at D Zone Silver-Lead-Zinc Target After Completing 1,729 Metres at Kuhn
【SMM Flash News】GoldHaven Begins Drilling at D Zone Silver-Lead-Zinc Target After Completing 1,729 Metres at Kuhn
GoldHaven Resources Corp. announced the completion of its 2026 drilling program at the Kuhn tungsten-skarn target within the Magno Project in British Columbia, Canada. The program comprised eight drill holes totaling 1,729 metres. Drill hole GOH26-08 intersected skarn mineralisation at depth approximately 80 metres along strike from the lower skarn zone previously encountered in GOH26-04. The company noted that further drilling and laboratory assays are required to establish mineralisation continuity and grades. Following completion of the Kuhn program, GoldHaven has mobilised its drill rig to the D Zone silver-lead-zinc target, where drilling is now underway. The D Zone lies within the broader Magno Project and hosts polymetallic mineralisation in Lower Cambrian Atan Group carbonate rocks, including galena, sphalerite and locally massive sulphides. The current program is designed to test the geometry and potential extensions of historically identified silver-lead-zinc mineralisation.
59 mins ago
【SMM Flash News】Metalsource Begins Phase 2 Drilling at Silver Hill, Targeting Ground 1.12 Kilometres North.
1 hour ago
【SMM Flash News】Metalsource Begins Phase 2 Drilling at Silver Hill, Targeting Ground 1.12 Kilometres North.
Read More
【SMM Flash News】Metalsource Begins Phase 2 Drilling at Silver Hill, Targeting Ground 1.12 Kilometres North.
【SMM Flash News】Metalsource Begins Phase 2 Drilling at Silver Hill, Targeting Ground 1.12 Kilometres North.
Metalsource Mining announced Phase 2 exploration drilling at Silver Hill, North Carolina, targeting IP anomalies approximately 1,120 metres north of the known mineralization. A second rig and night shift have been added to support near-mine expansion and testing farther afield. SH26-34 visually intersected approximately 20 metres of mineralization in core, with assays pending. Gold-silver-lead-zinc mineralization has also been identified in subcrop 240 metres northeast.
1 hour ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
SHFE zinc opened higher with a gap in the night session, boosted by LME [SMM Zinc Morning Comment] - Shanghai Metals Market (SMM)