Magna Mining Approves Restart of Levack Nickel-Copper Mine, Targeting Mid-2028 Commercial Production

Published: Oct 09, 2026 09:24 (GMT+8)

Magna Mining has formally approved the restart of the Levack nickel-copper mine in Ontario's Sudbury Basin, which has been out of production since 2018. The company will rehabilitate existing underground infrastructure, recommission hoisting systems and accelerate underground development and surface construction over the coming months.

The new PEA outlines approximately 7.3 years of commercial production, with start-up targeted for mid-2028 and average annual payable production of around 36.8 million lb of copper equivalent. Initial capital is estimated at C$70.1 million, while Magna calculates a much lower net funding requirement after pre-commercial operating cash flow and tax credits. Early mining will prioritize higher-grade copper and precious-metals-rich footwall zones.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Peru’s August Molybdenum Export Value Rises 33% YoY】
2 mins ago
【Flash | Peru’s August Molybdenum Export Value Rises 33% YoY】
Read More
【Flash | Peru’s August Molybdenum Export Value Rises 33% YoY】
【Flash | Peru’s August Molybdenum Export Value Rises 33% YoY】
Peru’s Central Reserve Bank reported molybdenum export value of $187 million in August 2026, down 3.6% from the revised July figure but up 32.6% year on year. January–August export value reached $1.371 billion, up 23.6% year on year. The series measures FOB export value rather than physical volume or mine production.
2 mins ago
Cochilco: 80.1% of Chilean copper mining power now accredited renewable
37 mins ago
Cochilco: 80.1% of Chilean copper mining power now accredited renewable
Read More
Cochilco: 80.1% of Chilean copper mining power now accredited renewable
Cochilco: 80.1% of Chilean copper mining power now accredited renewable
Chile's copper commission Cochilco reports that accredited renewable electricity now accounts for 80.1% of total power used by the country's copper mining industry, underscoring how far the sector has moved toward a clean-energy matrix. Cochilco notes that electricity represents roughly 30% of national demand from copper operations and up to 30% of some mines' operating costs. As ore grades decline and desalination expands, power use per tonne of copper keeps climbing, making long-term renewable PPAs central to securing both low-carbon credentials and cost control. The data reinforces Chile's position as a supplier of traceable, low-emission copper as buyers and regulators increasingly price embedded carbon.
37 mins ago
【Flash | Gibraltar’s Q3 Molybdenum Output Falls Despite Stronger Copper Production】
38 mins ago
【Flash | Gibraltar’s Q3 Molybdenum Output Falls Despite Stronger Copper Production】
Read More
【Flash | Gibraltar’s Q3 Molybdenum Output Falls Despite Stronger Copper Production】
【Flash | Gibraltar’s Q3 Molybdenum Output Falls Despite Stronger Copper Production】
Trekor Metals reported Q3 2026 molybdenum production of 380,000 lb (about 172 tonnes) at its wholly owned Gibraltar mine, down 32.0% QoQ from 559,000 lb and 31.9% YoY from 558,000 lb. Based on company data, SMM calculates nine-month output at 1.656 million lb (about 751 tonnes), up approximately 54.2% YoY, supported by strong Q1 production. Copper output increased 12% QoQ, highlighting diverging by-product performance. The company did not separately explain the molybdenum decline.
38 mins ago