[SMM PV Flash] Germany Anticipates Over 600,000 Tonnes of Solar PV Waste by 2030

Published: Oct 05, 2026 17:28 (GMT+8)
According to recent research, with the large-scale aging of early solar power plants, Germany is on course to generate over 600,000 tonnes of end-of-life solar PV modules by 2030. By the end of 2023, installed modules contain significant recyclable materials holding billions of euros in recovery potential for metals like aluminum and silver. Advancing large-scale module recycling not only meets environmental mandates and absorption pressures but also supplements the upstream auxiliary supply chain with extracted high-value metals, paving the way for accelerated growth in Europe's local PV recycling industry.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV Flash] ContourGlobal Completes Construction of 324MW Solar PV Complex in Colorado
37 mins ago
[SMM PV Flash] ContourGlobal Completes Construction of 324MW Solar PV Complex in Colorado
Read More
[SMM PV Flash] ContourGlobal Completes Construction of 324MW Solar PV Complex in Colorado
[SMM PV Flash] ContourGlobal Completes Construction of 324MW Solar PV Complex in Colorado
Independent power producer (IPP) ContourGlobal, in partnership with a local public power utility, has completed the construction of the 324MW Black Hollow Sun solar PV complex in Colorado, US, four months ahead of schedule. The full commissioning of this project will supply substantial clean energy to the local grid. With this completion, ContourGlobal's total operating and under-construction renewable energy portfolio in the US has reached 1.5GW. The smooth progress of such utility-scale projects indicates that the US utility-scale solar market maintains a steady installation momentum.
37 mins ago
[SMM PV Flash] First Solar Sues JA Solar and Corning Subsidiary in US Over TOPCon Patent Infringement
39 mins ago
[SMM PV Flash] First Solar Sues JA Solar and Corning Subsidiary in US Over TOPCon Patent Infringement
Read More
[SMM PV Flash] First Solar Sues JA Solar and Corning Subsidiary in US Over TOPCon Patent Infringement
[SMM PV Flash] First Solar Sues JA Solar and Corning Subsidiary in US Over TOPCon Patent Infringement
On October 1, US solar manufacturer First Solar filed a patent infringement lawsuit in a Delaware federal court against Chinese module manufacturer JA Solar and American Panel Solutions, a subsidiary of Corning. First Solar alleges that these companies engaged in the unauthorized use of its core patents related to the manufacturing of TOPCon crystalline silicon solar cells. As competition within the global PV supply chain intensifies, technical patent scrutiny targeting leading Chinese module makers expanding overseas is becoming stricter, which may bring uncertainties to their capacity expansion and sales in the North American market.
39 mins ago
[SMM PV Flash] Japan Tightens Grid Access Rules as Battery Queue Reaches 172GW
39 mins ago
[SMM PV Flash] Japan Tightens Grid Access Rules as Battery Queue Reaches 172GW
Read More
[SMM PV Flash] Japan Tightens Grid Access Rules as Battery Queue Reaches 172GW
[SMM PV Flash] Japan Tightens Grid Access Rules as Battery Queue Reaches 172GW
Japanese regulators have recently tightened grid access rules for renewable energy and storage projects. Under the new regulations, power generators, including battery storage developers, must prove their rights to the project sites to maintain their grid connection queue status. This move aims to curb severe capacity hoarding; currently, the battery queue waiting for grid connection in Japan has reached a staggering 172GW, while actual connected utility-scale storage is less than 1GW. This policy is expected to accelerate the clearing of speculative projects and free up grid capacity for viable solar-plus-storage systems.
39 mins ago