[SMM PV Flash] Indonesian Nickel Project Advances 20 MWp Solar and 30 MWh Storage Build

Published: Sep 29, 2026 09:47 (GMT+8)
Kolaka Nickel is advancing a 20 MWp solar project paired with a 20 MW/30 MWh battery system in Southeast Sulawesi, Indonesia, to supply self-generated clean electricity to an operating nickel-industry site. The project secured non-recourse financing from three banks in January 2026 and has now moved into equipment supply and implementation, with the module order in place. The development embeds solar-plus-storage directly into an energy-intensive industrial load, highlighting growing use of project finance to reduce power costs and emissions intensity across Southeast Asian mining operations.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV Flash] Germany's 2026 Solar Generation Surpasses Full-Year 2025 Output by September
25 mins ago
[SMM PV Flash] Germany's 2026 Solar Generation Surpasses Full-Year 2025 Output by September
Read More
[SMM PV Flash] Germany's 2026 Solar Generation Surpasses Full-Year 2025 Output by September
[SMM PV Flash] Germany's 2026 Solar Generation Surpasses Full-Year 2025 Output by September
Germany's net solar generation reached 90.2 TWh by September 27, already exceeding the roughly 90.0 TWh produced during all of 2025 and setting a new annual record before the fourth quarter. The increase reflects both continued capacity additions and favourable sunshine conditions, while the concentration of output around midday further raises the need for grid flexibility, storage and demand response. The milestone shows that Germany's solar supply base is still expanding rapidly, shifting more market attention toward curtailment, negative-price exposure and storage revenue mechanisms.
25 mins ago
[SMM PV Flash] Next2Sun Passes €5 Million Indication Threshold, but Insolvency Risk Is Not Yet Fully Cleared
25 mins ago
[SMM PV Flash] Next2Sun Passes €5 Million Indication Threshold, but Insolvency Risk Is Not Yet Fully Cleared
Read More
[SMM PV Flash] Next2Sun Passes €5 Million Indication Threshold, but Insolvency Risk Is Not Yet Fully Cleared
[SMM PV Flash] Next2Sun Passes €5 Million Indication Threshold, but Insolvency Risk Is Not Yet Fully Cleared
German vertical bifacial PV specialist Next2Sun says it received more than €5 million in share subscriptions and funding offers by the end of last weekend, meeting the interim threshold it set to avoid an insolvency filing. The company cautioned that some indications still need to be firmed up and plans to confirm by Friday whether sufficient binding commitments can be accepted to complete the financing. The result therefore represents a critical liquidity milestone, but it does not yet mean that all funds have been received or that the company's going-concern risk has been fully removed.
25 mins ago
[SMM PV Flash] PAD RES Secures PLN 192.5 Million for a 133 MW Polish Solar Portfolio
25 mins ago
[SMM PV Flash] PAD RES Secures PLN 192.5 Million for a 133 MW Polish Solar Portfolio
Read More
[SMM PV Flash] PAD RES Secures PLN 192.5 Million for a 133 MW Polish Solar Portfolio
[SMM PV Flash] PAD RES Secures PLN 192.5 Million for a 133 MW Polish Solar Portfolio
PAD RES has secured PLN 192.5 million in long-term financing from UniCredit to build and operate three solar farms in Poland with a combined capacity of 133 MW. The financing covers the 90 MW Krapkowice, 18 MW Strzelce Opolskie and 25 MW Gromadka projects, all of which are under construction and are expected to generate around 140 GWh annually, equivalent to the yearly demand of roughly 47,000 homes. PAD RES plans to retain the assets after commissioning, indicating continued lender appetite for developers shifting from project origination toward long-term ownership and operation.
25 mins ago